Laserfiche WebLink
Use sar%_.aterias as bedding. If water could enter the t�iole,O/C Tanks recommends the tanks be <br /> long-handled Place firslT2"lift evenly around mechanically anchored u „essthe minimum burial depth from tank top is <br /> probe tanks.From the bank or adjacent asfollows: <br /> tanktop,ball must apushed <br /> completely beneath tank bottom, Concrete Traffic <br /> betweenribsand un der endcaps <br /> Second to provide necessary support.A Slab Thickness 0” 6" <br /> ' 12'lift of long handled probe can be used Tank Minimum buried depth when <br /> backfill to penetrate backfilt and push it <br /> between all ribs and at 3 to 5 points DemeterMechanical Anchoring is Not Required <br /> voids under endcaps.The backfill may 4' 30" 27' <br /> be shoveled beneath the tank. 61 45" 42" <br /> Place another 120 lift of backfill 81 54" 51" <br /> -- �_• �12'6ed'-�•"'� evenly around tanks.Repeat the 10, 69" <br /> probing of backfill from the bank or 12' 81" 78" <br /> adjacenttanktop. At the above burial depths,the overburden above the tank weighs more <br /> Probe After completion of second lift, than the buoyancy of the empty tank with water to grade(safety factor <br /> k""handledbackfill can be brought to top of equals l.2). <br /> tanks or grade without additional Note:TANKS INSTALLED WITH BACKFILL TO TOP OF TANK BUT <br /> hquired krslab support.) <br /> maybe WITHOUT BACKFILL TO GRADE SHOULD BE COMPLETELY FILLED <br /> required for slab support.) WITH WA-TER OR PRODUCT AS BALLAST.DO NOT PLACE WATER <br /> 1 This method will not work in tight OR PRODUCT IN TANK UNTIL BACKFILL IS EVEN WITH TANK TOP. <br /> areas in straight-walled holes.The <br /> 4'curved angle necessary to probe the back- For burial depths where mechanical anchoring is recommended.either <br /> probed section fill under the tank can not be made of two common methods can be used:aconcrete anchor pad ordead- <br /> with the long-handled probe. man anchors.Both methods include the use of Fiberglas anchor straps. <br /> Straight-walled holes in tight areas <br /> ��`•;��• will require a curved probe to Strapping <br /> backfill under the tanks. Use Fiberglas anchor straps be, <br /> The curved probe is a 41 section of tween the arrows on the tank <br /> the long handled aluminum probe bent on a radius to match the tank wrnbockie sides. <br /> curvature.A leveraging action on the long-handled probe creates a tonal For double-wall tanks,2,500 <br /> pushing action under the tank bottom, vlple gallon rapacity and larger,the <br /> The following procedure is the most effective for the curved probe: clamped anchor straps must also be placed <br /> a.After setting the tank on the gravel bed.probe the entire tank bottom wire in the strap guides at the tank top. <br /> and around the end caps. :o_ ._;::s::;z For single-wall tanks 2,000 gallon <br /> capacity and larger,anchor straps <br /> b.Place the first 12"lift of backfill. - Y <br /> c.Probe the entire tank bottom and end caps a gin. A �1 must be placed on top of all <br /> d.Placethesecond 12"liftofbackfill. designated external ribs(►), <br /> e.Switch to straight probe section and probe tank again- Anchor points should be spaced <br /> 4 equal to tank diameter plus 1'on <br /> each side of tank,regardless of tank diameter.Anchor points at bottom of <br /> AB. Installation Procedure—Wet Hole hole must be aligned with designatedribs tl". <br /> A filter fabric separator may be appropriate to prevent gravel migration. <br /> All anchor straps must be uniformly fightened with turnbuckles or comew <br /> Refer to Section A6 for details.Water level should be maintained at lowest a-longs.Straps should besnug but cause no tank deflection.Deflection <br /> practical level by using pumps with or without a well-point system. can be detected by checking tank diameter with a gauge stick before and <br /> Prepare bed as outlined in Section AT after snugging straps. <br /> Ballast Triple clamp the wire rope. <br /> If the water can not be lowered, Note:Do Not Use Straps or Cables Between Ribs. <br /> you will need to ballast tanks. <br /> Place tanks in the hole,adding _ Concrete Anchor Pad <br /> only enough ballast to sink them. 12 The weight of overburden on top of <br /> Ballast level in tanks must nevere•min. the concrete slab provides the <br /> exceed water level in hole during es Ro-bar�` thickness anchoring force. <br /> installation.While adding ballast, 12•o.c. <br /> use only lifting cable to keep tanks each way This pad design is strictly for <br /> in position.Tanks should be free to buoyancy.Poor soil conditions <br /> roll slightly. triple mayrequireincreasedreinforce- <br /> ment and slab size. <br /> Imbed anchor points in concrete <br /> _- - - Distribute backfill evenly around <br /> - tanks.Push <br /> ;R <br /> backfill undertank R`=':i�: ` and attach them to ends of straps <br /> :::1z•i17<_ eea with wire rope(see table at end of <br /> after each drop using efthera long handled probe oran air jet. this section)and clamp with at <br /> After backfill is at least 2'up the tank sides,additional backfill can be Uffl.cTnc:eta pato; ^bi_�..,ti least three clamps.(Be sure there <br /> freely added to tank top without using the probe or air jet. is a 12" bed between concrete <br /> An air jet can be constructed by using a 8L"diameter pipe connected to a pad and tanks.) <br /> minimum 65 cfm air compressor.A valve on the air jet is essential so the The concrete pad must extend a minimum of l8"beyond sides of tank <br /> operator can safely control the flow. and be at least equal in length to the tank.It is best to extend the slab to <br /> the undisturbed native soil. <br /> Additional information on alternate out of hole techniques are available <br /> from OIC Tanks.Ask for Pub.No.3-PE-13415,Alternate Backfill Deadman Anchors <br /> Procedure. deadmanisnua <br /> lenWhoftank The weight of overburden on top <br /> oneach site of the deadman and tank provides <br /> A9. Anchoringthe anchoring force Lay deadman <br /> along each side and parallel to <br /> It isthe responsibility of the tank owner or his technical representative totank.The tank must not'over- <br /> determineifinechanicalanchoringisrequiredforaspecificjobsite.All triDie shadow'the deadman anchor. <br /> �--'� potential sources of water(underground watertable,ran water run-off, clam Clamp wire rope with at least three <br /> ps <br /> etc.)should beconsidered. clamps around deadman and through end of strap. <br /> o e" <br /> center aB4ebars In cross sectio .. <br /> F <br />