My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
INSTALL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/8/2018 9:51:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1990
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\1990 INSTALL.PDF
QuestysFileName
1990 INSTALL
QuestysRecordDate
12/6/2016 12:19:34 AM
QuestysRecordID
3271403
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1Site Preparation and Installation Manual <br /> 11&2501 Tank Level Sensing System <br /> isiwd <br /> 'L. Drill and tap the cap for 3/8-18 NI•I'cont{;rip tit,cold as 4. Fred <br /> I.hc call i bushing and tl,ough thl, ench e,j nCtic probe) <br /> �IfG <br /> shown in Figure 11. bustling. Leave enough slack in the cable between the c•ap <br /> :1. InstallawaLer-Light cable bushingin the:{/ri inch bread- and.junction box to allow the cap to easily reach the riser <br /> ed hole in the top of the locking cap. Use an appropriate pipe.In addition,leave enough slack under the risercapto <br /> thread sealant to ensure water I.ightness. Also Install it perntilconnection to the probe. <br /> water tight cable bushing in the probe.luncl ion box in it <br /> 5. 'Tighten the cable bushing nuts on the riser cap and <br /> similar manner. <br /> _ ,ju nclinn box to ensure awater-tight seal at the cable <br /> entry. <br /> li. Ilsing wire nuts, connect the two-wire cable to the field <br /> + .062 wires in the prnbe,junci ion box.Re sure t.o observe color <br /> 1.438 375 — 18 N.P.T. codes for proper polarity hookup to the TIS monitor. <br /> Refer to Figure 6, "19.S-2501 Four-'Tank System Wiring <br /> -- Install:i ion Diagram" <br /> Nate: Du nal. seal wire nal, connections AT 'fII1S TIME. <br /> + Epoxy sealant, furnished with each prone, should <br /> ±.062 only be installed after warranty checkoutby it, <br /> 1.625 =____ _- __--__= nulhorized Veeder-Root.'I'LS Distributor. <br /> Note: HANDLE PROBE CAREFULLY! Striking or dropping <br /> probe will resull'Ill loss of calibration and could cause <br /> 311�3h, permanent.damage. <br /> 7. Carefully lower LIn•probe hila the ciser pipe'"ll"the top <br /> of the probe is approximately two feet above the top oft lie <br /> riser pipe. <br /> 8. (look the open end link of the strain relief chain to, I.lie <br /> :d t.achnn•111,poind.provided on the probe cable.Crimp I.lie o <br /> link closed to preventaccidental det,au•hntent.. <br /> ' 9. Install ll the probe cable connector Lo the mating plug on the <br /> -- -- �`-� Lop of the probe. Be sure the connector is attached <br /> securely by hand Lightening the locking ring. <br /> ® Note: TIS-260i probescontain a glass cylinder which can be <br /> broken if the probes are dropped or struck during <br /> handling and installation. <br /> Figure 11. Riser Cap Modification Note: Do nut.allow probe to free-fall and/or sharply impact <br /> I.lie boll otn of cliv tank. Shock to the probe footwill <br /> resull in severe probe damage. <br /> C. INSTALLATION. Install each probe is follows: <br /> WARNING: TO AVOID ELECTRICAL SHOCK WHICH 111 IloldIitg(lie riser pipe cap and probe cable,CAREFl1LLY <br /> COULD KILL YOU, RE SURF. AC POWER TO THE lower the probe the rest of the way into the tank until it <br /> MONITOR IS OFF DURING INSTALLATION. gently touches Lite bottom. IIF SURE THE WERHIT OF <br /> L Turn OFF power to the TIS-2501 system. THE PROBE.IS BEING CARRIED BY THE CHAIN STRAIN <br /> RELIEF.Ensure that there is enough slack in the cable to <br /> CAUTION: DO NOT INSTALL THF, PROBE IF ANY LIQUID allow the probe to touch the bottom of the tank.Refer to <br /> OTHER THAN THE PRODUCTTO BE DISPENSED IS IN Figure 1. <br /> THE TANK. FAILURE TO COMPLY CAN RESULT IN <br /> EQUIPMENT DAMAGE., INACCURATE INVENTORY 11. Secure the riser locking cap to the top of the riser pipe.A <br /> CONTROL,OR UNDETECTED POTENTIAL ENVIRON- padlock may be installed for added security. <br /> MENTAL AND HEALTH HAZARDS. <br /> 2. Make sure any liquid other than the product to be <br /> dispensed has been pumped out of the tank. DO NOT APPLY POWER TO THE TLS2501 SYSTEM. <br /> Note: TIS-250i probes contain a glass cylinder which can be CONTACT YOUR AUTHORIZED VEEDER-ROOT TLS <br /> broken if the probes are dropped or struck during DISTRIBUTOR FOR WARRANTY CHECKOUT AND SYS- <br /> handling and installation. TEM START-IIP. <br /> 3. Be sire there is no sludge in tile bottom of the tarok.Sludge Note: The installer of this product should remove the front <br /> can clog lite water-entry hole near the Isulont of I.he panel key mud present. 8. Lo an mtlhoriz, user to <br /> probe, resulting in inaccurate water heightreadingsprevent utisuse oft lie product. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.