My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:30 PM
Creation date
11/8/2018 9:53:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\REYNOLDS RANCH\2680\PR0535432\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�GHAlLS <br /> CIVIL ENGINEERING,LAND 7LANNING,SURVEYING <br /> 2ss January 28,2013 <br /> eN��Ns acacaoit(alslcehd.com <br /> (209)468-3453 <br /> Aris Cacapit,REHS <br /> San Joaquin County <br /> Environmental Health Department—CUPA <br /> 1868 East Hazelton Road <br /> Stockton, CA 95205 <br /> RE: Response to Comments—Costco Lubrizol Updates <br /> Costco Gasoline- Fuel Additive Program <br /> 2680 Reynolds Ranch Parkway, Lodl, California 95240 <br /> Costco Loc. No. 1091 /Our Job No. 14573 <br /> Dear Arts: <br /> We have revised the plans and technical documents for the above-referenced project In accordance with <br /> e-mail comments from your office dated January 22, 2013 and January 23, 2013. Enclosed are the <br /> following documents for your review and approval: <br /> 1. One(1)PDF of your January 22, 2013 e-mail <br /> 2. One(1)PDF of the January 23, 2013 e-mail from Raymond von FIOe of your office <br /> 3. One(1)PDF of the revised and signed Monitoring Plan—Tank 4, Lubrizol(with attachment) <br /> 4. One (1) PDF of the revised and signed San Joaquin County Environmental Health <br /> Department Service Request Form (Service Code: 198/PE:2308) <br /> 5. One (1) PDF of the revised and signed San Joaquin County Environmental Health <br /> Department Service Request Form (Service Code: 031 /PE: 2303) <br /> 6. One(1)PDF copy of the Containment Solutions Monitoring Fluid Fill Kit installation guide <br /> 7. One (1) PDF copy of the Containment Solutions Double-Wail Tank Sump Installation <br /> Instructions <br /> B. One (1) PDF of the signed, revised Tank Sheets 1 through 4 prepared by <br /> Barghausen Consulting Engineers, Inc.dated January 25, 2013 <br /> The following outline provides each of the January 22, 2013 comments in italics exactly as written, along <br /> with a narrative response describing how each comment was addressed: <br /> 1. Monitoring Plan must indicate in section X. that the spill container for the manual transfer <br /> pump operation must describe the means in which it will be kept empty per CCR2635(b)(1). <br /> (For Garrett, Thuy, &Ars) <br /> Response: Enclosed is a copy of the revised monitoring plan, which includes an attachment <br /> describing the procedures for cleaning the manual transfer spill container in the case of an <br /> unauthorized release. <br /> 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAX <br /> BRANCH OFFICES 4 OLYMPIA,WA ♦ CONCORD,CA ♦ TEMECULA,CA <br /> w .bargheusenxom <br />
The URL can be used to link to this page
Your browser does not support the video tag.