Laserfiche WebLink
0 -5- 0 <br /> Diagnostics (ISD) system and a shut down of the submersible pumps to all <br /> gasoline tanks by the ISD systems. <br /> Phase I System <br /> 1. The Phase I system shall be an ARB-certified system that demonstrates <br /> compliance with the static pressure decay test criteria contained in the latest <br /> version of TP-201.3. <br /> Maintenance Records <br /> 1. Each GDF operator/owner shall keep records of maintenance performed at the <br /> facility. Such records shall be maintained on site in accordance with district <br /> requirements or policies. The records shall include the test or maintenance date, <br /> repair date to correct test failure, maintenance or test performed, and if <br /> applicable, affiliation, telephone number and name of the individual conducting <br /> maintenance or test. An example of a GDF Maintenance Record is shown in <br /> Figure 2B-18. <br /> 2. Maintenance shall be conducted in accordance with Healy Systems Scheduled <br /> Maintenance document in Figure 26-19. <br /> 3. Reconnection of breakaways shall be included in the maintenance records. <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 2—VR-202-A <br />