Laserfiche WebLink
-15- • <br /> Executive Order VR-202-A <br /> Healy Phase II EVR System <br /> Including Veeder-Root ISD <br /> Exhibit 2 <br /> Figure 213-7 <br /> Typical Installation of a Two PN Vent Valve Parallel Manifold <br /> with Healy Clean Air Separator <br /> (This configuration requires additional PN vent valves that are not supplied in the Healy installation kit) <br /> PVENT <br /> VALVES <br /> AIR BREATHER <br /> MINIMUM SLOPE ASSEMBLY <br /> 1/8" PER FOOT, P/N 9948 <br /> 100 FT. MAX. VAPOR INLET 12' MINIMUM <br /> LENGTH ASSEMBLY ABOVE GRADE <br /> P/N 9956 <br /> FLOAT CHECK <br /> VALVE F <br /> P/N 9466G A <br /> OVERFILL II PLUG <br /> PROTECTION <br /> BALL VALVE <br /> LOCKED OPEN <br /> SORE <br /> IN NORMAL <br /> OPERATION �\ �i VAPOR i <br /> � h i <br /> i <br /> BALL VALVES AIR <br /> LOCKED CLOSED <br /> OR S= <br /> IN NORMAL <br /> OPERATION i( i <br /> E813 C <br /> n <br /> BALL VALVE h� <br /> LOCKED CLOSED <br /> U OR <br /> ry�� <br /> IN NORMAL <br /> OPERATION <br /> PLUG D <br /> —III—III—III—III—III—III—III—III- a '. "+. � '• • :a .�. . �_' .. . •.. I—I I I <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 2—VR-202-A <br />