Laserfiche WebLink
-16- • <br /> Executive Order VR-202-A <br /> Healy Phase If EVR System <br /> Including Veeder-Root ISD <br /> Exhibit 2 <br /> Figure 213-8 <br /> Typical Installation of a Three PN Vent Valve Parallel Manifold <br /> with Healy Clean Air Separator <br /> (This configuration requires additional PN vent valves that are not supplied in the Healy installation kit) <br /> VENT <br /> VALVES <br /> AIR BREATHER <br /> MINIMUM SLOPE ASSEMBLY <br /> 1/8" PER FOOT, P/N 9948 <br /> 100 FT. MAX. VAPOR INLET 12' MINIMUM <br /> LENGTH ASSEMBLY ABOVE GRADE <br /> P/N 9956 <br /> FLOAT CHECK <br /> VALVE F <br /> P/N 9466G A <br /> OVERFILL li PLUG <br /> PROTECTION <br /> BALL VALVE 0 <br /> LOCKED OPEN I� <br /> I=OR Eg:i 0 <br /> IN NORMAL <br /> OPERATION VAPOR <br /> i <br /> i <br /> BALL VALVES ���� AIR <br /> LOCKED CLOSED <br /> OR <br /> IN NORMAL <br /> OPERATION <br /> it <br /> JB CB C <br /> BALL VALVE 11 <br /> LOCKED CLOSED <br /> Ll OR <br /> i <br /> IN NORMAL <br /> OPERATION <br /> E <br /> PLUG D <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 2—VR-202-A <br />