My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Dimensional Requirements: C. Flanged Manways <br /> (refer to Containment Solutions literature on gallonage): 1. The standard manway is 22"ID.The 30"and 36'ID manways are <br /> 1. Nominal capacity of the tank shall be_gallons. optional. <br /> 2. Nominal outside diameter of the tank shall be_feet. 2. All manways will be furnished complete with U.L. listed gaskets, <br /> 3. Nominal overall length of the tank shall be_feet. bolts and covers. <br /> D. Monitoring Capabilities: 3. Location–see standard tank drawings(pages 15-22). <br /> 1. Tanks shall have a space between the primary and secondary 4. The steel manway cover is standard with 4" diameter NPT " ° <br /> shell walls to allow for the free flow and containment of all leaked fittings.22'manway covers with an even number of fittings will <br /> product from the primary tank. be placed on an 8"radius.Manway covers with an odd number <br /> 2. The following continuous monitoring conditions shall be of fittings will have one fitting centered and the remaining <br /> compatible with the cavity between the inner and outer tanks: fittings placed on an 8' radius. 30" manway cover fittings are <br /> • Vented to atmosphere standard 12'radius.36'manway cover fittings are standard 15° <br /> radius. a " <br /> • Vacuum–1.5 psi maximum(3"mercury) 5. Manway risers 48" in diameter and 42" high will be supplied to <br /> • Positive air pressure(3 psi maximum) provide access to the manway lid.A 24'x 24'galvanized street <br /> • External hydrostatic pressure–7' maximum groundwater head box with a cover must be provided by contractor for at-grade <br /> pressure over tank top installation. <br /> 3. Tanks 6' diameter and larger shall have an integrally mounted 6. Fiberglass manway extension tubes 24"long will be provided for <br /> reservoir' installed on the tank for optional hydrostatic the manways. <br /> monitoring. The reservoir shall be constructed of fiberglass D. Fill Tubes – Fill tubes of appropriate design will be supplied by <br /> reinforced plastic materials and warranted for 30 years against <br /> failure due to internal/external corrosion and when properly contractor. <br /> installed,against structural failure(same as tank warranty). E. Hydrostatic Monitor Accessories: <br /> 4' diameter DWT-6 Type II tanks do not include a fiberglass 1. Brine Antifreeze <br /> reservoir. A 4"diameter riser pipe screwed into the 4°diameter Brine Solution Designation: BAS-30 <br /> annular space fitting will serve as the reservoir. Chemical Composition: 30%+ calcium chloride, 1% to 3% <br /> / 4. Tank shall be designed with one 4"fitting that will access the tank potassium chloride, 1%to 2%sodium chloride, Balance water <br /> bottom between the primary and secondary walls (annular Visual Appearance: Green in color, Odorless fluid <br /> space). Specific Gravity @ 60°F: 1.272-1.317 <br /> 5. The double-wall tank monitor shall be capable of detecting a Factory installed on tanks 30,000 gallon and under. Bulk brine <br /> breach in the inner and/or outertank under the following installed jobsite installed on 35,000 gallon and 40,000 gallon tanks. <br /> conditions: 2. Reservoir Sensor – The FHRB 810 reservoir sensor is <br /> a. When the inner tank is empty. specifically designed for installation in the reservoirs of CSI <br /> b. When the inner tank is partially or completely full and the double-wall tanks. The components of the sensor are <br /> groundwater table is below the tank bottom. compatible with CSI supplied brine solutions.The sensor is also <br /> c. When the inner tank is partially or completely full and the tank compatible with any other control panel that accepts normally <br /> s partially n completely submerged in groundwater. open or closed switches.The sensor provides two alarm points: <br /> 6. The leak detection performance of the hydrostatic monitoring high brine and low brine.The sensor can be wired to a control <br /> system shall be tested and verified by a qualified independent panel to provide onlya single alarm ire distinguishing report <br /> between <br /> high or low alarms) or it can be wired to report bath alarm <br /> consultant to detect leaks as small as 0.10 gallons per hour conditions. <br /> within a one month period. 4. Tank Gauge Probe–The IPFW Series tank gauge probe shall <br /> 7. All monitoring equipment, including FRP reservoirs and be capable of continuously monitoring liquid levels and <br /> electronic controls,shall be UL listed or accepted. detecting water in hydrocarbons at the bottom of tanks. The <br /> 8. If hydrostatically monitored, any solution used in the tank probe shall be compatible with the liquid it is intended to be <br /> annular space shall have UL approval for compatibility with the submerged in and sized properly to fit into the tank without <br /> tank and be a contrasting color to the tank surface to facilitate damaging the tank during installation or operation. The tank <br /> visual inspection of the tank for leaks prior to burial. gauge probe shall not be rigidly mounted in the tank. <br /> 2.02 Accessories <br /> F. Turbine Enclosures and Collars: <br /> A. Anchor Straps–Provide glass fiber reinforced plastic anchor straps <br /> for each tank shown. Number and location of straps shall be as 1. Non-sealed FRP Turbine Enclosure (Model NTE Series) o The <br /> specified by manufacturer. Each strap shall be capable of non-sealed turbine enclosure consists le a h in 1l2"i reinforced <br /> withstanding a maximum load for each tank diameter as shown. plastic(FRP) enclosure body(variable length in 12°increments, <br /> 4'0 — 4,200 lbs. 42'or 48'ID's),an FRP reducer(42"x30°or 48"x30"ID's),and a <br /> 6'0 — 18,000 lbs. loose fit FRP lid with handle. The reducer opening must be large <br /> 8'0 — 25,000 lbs. enough(minimum 28")to allow for the removal of a 22'manway <br /> 10'0 — 25,000 lbs. lid. The lid OD must be small enough to be removed through a <br /> Straps shall be standard as supplied by the tank manufacturer. 36"street box.The enclosure body must be capable of joining to <br /> B. Certification Plate – Underwriters Laboratories label shall be the 42° or es diameter secondary containment collar with a <br /> permanently affixed to each tank. <br /> leaktight adhesive joint. <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.