Laserfiche WebLink
0 -2- <br /> Phase I vapor recovery system and installed operated, and maintained as <br /> specified herein and in the following exhibits. Exhibit 1 contains a list of the <br /> equipment certified for use with the Healy Phase II EVR System Including Veeder- <br /> Root ISD. Exhibit 2 contains the performance standards, specifications, typical <br /> installation drawings and maintenance intervals applicable to the Healy Phase II <br /> EVR System Including Veeder-Root ISD as installed in a gasoline dispensing <br /> facility (GDF). Exhibit 3 contains the manufacturing specifications. Exhibit 4 is the <br /> test procedure for verifying performance of the Healy Clean Air Separator. Exhibit <br /> 5 is the vapor to liquid ratio test procedure for verifying performance of the Healy <br /> 900 Nozzle. Exhibit 6 is the Healy and Veeder-Root ISD Phase II EVR System <br /> Limited Warranty. Exhibit 7 is the nozzle bag test procedure. Exhibit 8 provides <br /> Required Items in conducting TP-201.3. Exhibit 9 is the ISD Operability Test <br /> Procedure. <br /> IT IS FURTHER ORDERED that compliance with the applicable certification <br /> requirements, rules and regulations of the Division of Measurement Standards of <br /> the Department of Food and Agriculture, the Office of the State Fire Marshal of the <br /> Department of Forestry and Fire Protection, the Division of Occupational Safety <br /> and Health of the Department of Industrial Relations, and the Division of Water <br /> Quality of the State Water Resources Control Board is made a condition of this <br /> certification. <br /> IT IS FURTHER ORDERED that Healy shall provide a warranty for the vapor <br /> recovery system and components to the initial purchaser. The warranty shall be <br /> passed on to each subsequent purchaser within the warranty period. The <br /> manufacturer of components listed in Exhibit 1 not manufactured by Healy <br /> Systems, Inc. or Veeder-Root shall provide a warranty to each of their components <br /> certified herein. The warranty shall include the ongoing compliance with all <br /> applicable performance standards and specifications and shall comply with all <br /> warranty requirements in Section 9.2 of the Certification Procedure. Healy or <br /> other manufacturers may specify that the warranty is contingent upon the use of <br /> trained installers. <br /> IT IS FURTHER ORDERED that every certified component manufactured by <br /> Healy Systems, Inc. and Veeder-Root shall be performance tested by the <br /> manufacturer as provided in Exhibit 3. <br /> IT IS FURTHER ORDERED that the certified Healy Phase II EVR System <br /> Including Veeder-Root ISD shall be installed, operated, and maintained in <br /> accordance with the ARB Approved Installation, Operation, and Maintenance <br /> Manual for the Healy Phase II EVR System Including Veeder-Root ISD <br /> System. A copy of this Executive Order and the ARB Approved Installation, <br /> Operation and Maintenance Manual for the Healy Phase II EVR System <br /> HEALY PHASE 11 EVR SYSTEM INCLUDING VEEDER-ROOT ISD-VR-202-A <br />