My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- • <br /> Including Veeder-Root ISD System shall be maintained at each GDF where a <br /> Healy Phase II EVR System Including Veeder-Root ISD is installed. <br /> IT IS FURTHER ORDERED that equipment listed in Exhibit 1, shall be clearly <br /> identified by permanent identification number showing the manufacturer's name <br /> and model number unless exempted in writing by the Executive Officer or the <br /> Executive Officer delegate. <br /> IT IS FURTHER ORDERED that any alteration in the equipment parts, design, <br /> installation, or operation of the system certified hereby is prohibited and deemed <br /> inconsistent with this certification, unless the alteration has been submitted in <br /> writing and approved in writing by the Executive Officer or Executive Officer <br /> delegate. <br /> IT IS FURTHER ORDERED that the following requirements are made a condition <br /> of certification. The owner or operator of the Healy Phase II EVR System <br /> Including Veeder-Root ISD shall conduct and pass the following tests no later than <br /> 60 days after startup and at least once in each twelve month period, using the <br /> following test procedures: TP-201.3, Determination of 2 Inch WC Static <br /> Pressure Performance of Vapor Recovery Systems of Dispensing Facilities <br /> (March 17, 1999); Exhibit 8, Required Items in Conducting TP-201.3; Exhibit 4, <br /> Determination of Static Pressure Performance of the Healy Clean Air <br /> Separator; Exhibit 5, Vapor to Liquid Volume Ratio for Healy Including <br /> Veeder-Root ISD Phase Il EVR System; and Exhibit 9, ISD Operability Test <br /> Procedure. Shorter time periods may be specified in accordance with local <br /> district requirements. Notification of testing, and submittal of test results, shall be <br /> done in accordance with local district requirements and pursuant to policies <br /> established by that district. Alternative test procedures, including most recent <br /> versions of the test procedures listed above, may be used if determined by the <br /> ARB Executive Officer or Executive Officer delegate, in writing, to yield equivalent <br /> results. <br /> IT IS FURTHER ORDERED that the following requirements are made a condition <br /> of certification. The owner or operator of the Healy Phase II EVR System <br /> Including Veeder-Root ISD shall conduct, and pass, the following tests no later <br /> than 60 days after startup using Exhibit 7, Nozzle Bag Test Procedure. <br /> TP-201.4, Dynamic Back Pressure (July 3, 2002) shall be conducted in <br /> accordance with the conditions listed in item 1 of the Vapor Recovery Piping <br /> Configurations section of Exhibit 2. Local districts have the authority to require <br /> conducting of Exhibit 5, Vapor to Liquid Volume Ratio for Healy Including <br /> Veeder-Root ISD Phase 11 EVR System, in lieu of TP-201.4, Dynamic Back <br /> Pressure (July 3, 2002) provided that at least 2 gallons of product are introduced <br /> into the system through each dispenser riser prior to conducting the test. <br /> Notification of testing, and submittal of test results, shall be done in accordance <br /> with local district requirements and pursuant to the policies established by that <br /> HEALY PHASE 11 EVR SYSTEM INCLUDING VEEDER-ROOT ISD-VR-202-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.