Laserfiche WebLink
• -4- <br /> district. Alternative test procedures, including most recent versions of the test <br /> procedures listed above, may be used if determined by the ARB Executive Officer <br /> or Executive Officer delegate, in writing, to yield equivalent results. <br /> IT IS FURTHER ORDERED that, except as provided above, local districts at their <br /> option will specify the testing frequency of the nozzle vapor valves. If nozzle vapor <br /> valve tests are required by the district, the test shall be conducted in accordance <br /> with Exhibit 7, Nozzle Bag Test Procedure. <br /> IT IS FURTHER ORDERED that the Healy Phase II EVR System Including <br /> Veeder-Root ISD shall be compatible with fuels in common use in California at the <br /> time of certification and any modifications to comply with future California fuel <br /> requirements shall be approved in writing by the Executive Officer or Executive <br /> Officer delegate. <br /> IT IS FURTHER ORDERED that the certification of the Healy Phase 11 EVR <br /> System Including Veeder-Root ISD is valid through September 1, 2009. <br /> Executed at Sacramento, California, this 31 day of August 2005. <br /> 69-46?77;1 <br /> Catherine Witherspoon <br /> Executive Officer <br /> Attachments: <br /> Exhibit 1 Equipment List <br /> Exhibit 2 System Specifications <br /> Exhibit 3 Manufacturer Performance Standards and Specifications <br /> Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air <br /> Separator <br /> Exhibit 5 Vapor to Liquid Volume Ratio for Healy Phase II EVR System <br /> Exhibit 6 Healy Phase II EVR System Limited Warranty <br /> Exhibit 7 Nozzle Bag Test Procedure <br /> Exhibit 8 Required Items in Conducting TP-201.3 <br /> Exhibit 9 ISD Operability Test Procedure <br /> HEALY PHASE 11 EVR SYSTEM INCLUDING VEEDER-ROOT ISD-VR-202-A <br />