My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:29:34 PM
Creation date
11/8/2018 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\707\PR0505735\COMPLIANCE INFORMATION 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFORMATION 2008 - 2015
QuestysRecordDate
6/29/2018 3:29:31 PM
QuestysRecordID
3930717
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-'i nk Gauging/SIR Equi went: (X) Check this box if tank is used only for inventory control- <br /> ( ) Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: NSA <br /> O Yes L No* Has all input wiring been inspected for proper entry akterminatFo7nincluding testing for ground faults? <br /> O Yes No'r Were all tank gauging probes visually inspected for dsidue buildup? <br /> OYcs No* Was accuracy of system product love] readings testedYes Nn" Was accuracy orsystem water level readings tested? <br /> Yes No* Were all probes reinstalled properly? <br /> Yes NO Were all items on the equipment manufacturer's maintlist completed? <br /> * in the Scc <br /> 'tion H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Linc I Olt Detectors (LLD): (X) Check this box if LLDs are not installed, <br /> Complete t e following checklist: <br /> 0 Yes NO For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> N/A (Check all that apply) Simulated leak rate: ® 3 g.p.h.;❑ 0.1 g.p.h ;❑0.2 g.p.h, <br /> Exi Yes E No° Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑x Yes E No* Was the testing apparatus properly calibrated? <br /> 0 Ye No* f^'or mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes ❑ No* For electronic LLDs, docs the turbine automatically shut off if any portion of the monitoring system is disabled <br /> X N/A or disconnected? <br /> E-7 <br /> ❑ No'" For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring figs <br /> IK N/A or fails a test? <br /> D No For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> x N/A <br /> ❑ No" Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section 11, below,describe how and when these deficiencies were or will he corrected. <br /> H. Comm) nta: <br /> Page 3 of 4 0�/al <br />
The URL can be used to link to this page
Your browser does not support the video tag.