My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:29:34 PM
Creation date
11/8/2018 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\707\PR0505735\COMPLIANCE INFORMATION 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFORMATION 2008 - 2015
QuestysRecordDate
6/29/2018 3:29:31 PM
QuestysRecordID
3930717
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i • <br /> S W RCB,January 2002 Page_of_ <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Met od Developed By: 1-1 UDC Manufacturer I:I Industry Standard X Professional Engineer <br /> I i Other(Specify) <br /> Test Memod Used: D Pressure 7 Vacuum X Hydrostatic <br /> U Other(Spec) <br /> Test Equ pment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> UDC# 1&2 UDC#Sate I UDC# Sate 2 _ UDC# <br /> UDC M 'nufacturer. Bravo Bravo Bravo <br /> UDC M erial: Fiberglass Fiberglass Fiberglass <br /> UDC Dethe 28" 3l" 27" <br /> Height from UDC Bottom to Top 8" 10" 7" <br /> of Higheft Piping Penetration: <br /> Height from UDC Bottom to 7" 12" 10" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested 2"above Highest Piping Penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both xYes No DNA xYes No ['NA xYes 0N LJ NA ❑Yes UNo UNA <br /> roduct and water)?* _ <br /> Turbine Shutdown response time <br /> Is system programmed for fail- x Yes f-1 No U NA x Yes D No DNA x Yes U No DNA U Yes D No ❑NA <br /> safe shutdown?" <br /> Was failsafe verified to be U Yes x No DNA D Yes x No DNA D Yes xNo Ei NA U Yes U No DNA <br /> operatic, al?' <br /> Wait tim between applying <br /> pressurevacuum/water and 5 min 5 min 5 min 5 min <br /> starting st <br /> Test Sta Time: 11:15 11:10 12:00 <br /> Initial Ri adin (Ri): .00" .00" 00" .00" <br /> Test Eric Time: 11:45 11:40 12:30 <br /> Final Reading(RF): .00 .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RrR,): .00 .00 .00 <br /> Pass/Fait Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result: x Pass D Fail x Pass D Fail x Pass D Fail D Pass D Fail <br /> Was sen or removed for testing? x Yes D No DNA x Yes D No ;NA x Yes D No f.1NA x Yes UNo DNA <br /> Was sen or properly replaced and x Yes U No DNA x Yes ❑No DNA x Yes DNo DNA x Yes DNo DNA <br /> verified functional after testin . <br /> Comments—(include information on repairs made prior to testing and recommended follow-up forfailed tests) <br /> If the el itire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(') is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.