Laserfiche WebLink
p <br /> SWRCB January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Il Sump Manufacturer 0 Industry Standard X Professional Engineer <br /> Ll Other(Specify) <br /> Test Method Used: 0 Pressure ^u Vacuum X Hydrostatic <br /> ❑Other(Sped) <br /> Test Eq ipment Used: Caldwell Systems Equipment Resolution: .005130 min <br /> Sump#f Sump# sump ti Sump# <br /> Sump Di meter: 42" <br /> Sump Depth: 54" <br /> Sump M, terial: Fiberglass <br /> Height qom Tank Top to Top of 29„ <br /> Hi hest iping Penetration: <br /> Height fiforn Tank Top to lowest 32" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does tur3ine shut down when <br /> sump seirsor detects liquid(both x Yes I i No E NA I I Yes I1 No [JNA Ll Yes R No !INA [ [Yes l No [.NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe x Yes 0 No DNA 0 Yes J No C!NA 0 Yes J No I f NA i'.Yes U No CNA <br /> shutdow <br /> Was fai safe verified to be I,I Yes x No [INA 0 Yes ❑No 0 NA ❑Yes 0 No U NA L Yes U No INA <br /> o eratio al?4 <br /> Wait tirr a between applying <br /> pressure vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test: <br /> Test Sta Time: 10:20 <br /> Initial ding(Ri): .00" .00" .00" .00" <br /> Test End Time: 10:50 <br /> Final Reading(RF): .00 <br /> Test Duration: 30 min ExYesLDNo <br /> 30 min 30 min <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fa Threshold or Criteria: .005/30 min .005/30 min .005/30 min <br /> Test R suit: x Pass D Fai0 Pass 0 Fail 0 Pass 0 Fail <br /> Was se or removed for testing? x Yes ❑No [INA x Yes 0 No LI NA t.Yes U No NA <br /> Was ser sor properly replaced and xYes 0No 'JNA xYes 0 N IJ NA xYes 0No DNA Yes 0No i NA <br /> verified functional after testin ? <br /> Com nts—(include information on repairs made prior to testing, and recommended follow-up for failed lents) <br /> if the ew tae depth of the sump is not tested,specify how much was tested. If the answer to gIx of the questions indicated with an <br /> asterisk(')is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />