My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:29:34 PM
Creation date
11/8/2018 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\707\PR0505735\COMPLIANCE INFORMATION 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFORMATION 2008 - 2015
QuestysRecordDate
6/29/2018 3:29:31 PM
QuestysRecordID
3930717
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: x Took Manufacturer D Industry Standard 1.1 Professional Engineer <br /> 11 Other(Specify) <br /> Test Method Used: L1 Pressure x Vacuum U Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: Dwyer Manometer Equipment Resolution:+1-20/a <br /> 2ok# Tank# Tank# <br /> , Tank# I TanI <br /> Is Tank Exempt From Testing?' 0 Yes xNo n Yes 11 No I'l Yes FI No 11 Yes ONo <br /> Tank Capacity: 10,000 <br /> Tank Material: Fiberglass <br /> Tank Manufacturer: Unknown <br /> Product 3tored: Diesel <br /> Wait firr c between applying <br /> pressure'vacuumtwater and 30 min 30 min 30 min 30 min <br /> siturting est: <br /> Test St a t Time: 11:30 <br /> initial R-ading(Rj): 7.23 <br /> Test Ent Time: 12:30 <br /> Final Roading(RO: 6.77 <br /> Test Duration: I hour I hour I hour I hour <br /> Change in Reading(RF-Rj): A6 <br /> Pass/Fail Threshold or Criteria: No less than I" No less than I" No less than I" No less than I" <br /> Test Result; x Pass 0 Fail 0 Pass 0 Fail 0 Pass a Fall 0 Pass 0 Fail <br /> Was sensor removed for testing? xYes LINO nNA xYes ONo DNA xYes LlNo DNA xYes LINo -.-;NA <br /> Was sensor properly replaced and xYes i xYes ONo DNA <br /> verified functional after testing? <br /> I <br /> Comm vats—(include information on repairs made prior to lesfing,and recommendedfollow-upforfailed rests) <br /> Secondary containment systems wbere the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. (California Code or Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.