My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - PRESENT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
18754
>
2300 - Underground Storage Tank Program
>
PR0507164
>
COMPLIANCE INFO_2016 - PRESENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:35 AM
Creation date
11/8/2018 9:54:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - PRESENT
RECORD_ID
PR0507164
PE
2361
FACILITY_ID
FA0007722
FACILITY_NAME
ORLANDOS
STREET_NUMBER
18754
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
10517048
CURRENT_STATUS
01
SITE_LOCATION
18754 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\HWY 26\18754\PR0507164\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
1/17/2017 11:13:57 PM
QuestysRecordID
3313957
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standar., -: Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: X Pressure ❑ Vacuum Ll Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges inPsi/Nitrogen <br />Piping Run # 1 Piping Run # 2 <br />Equipment Resolution: 1!10-15Psi <br />Piping Run # 3 Piping Run #4 <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Ameron <br />Ameron <br />Ameron <br />Ameron <br />Piping Diameter: <br />2 %¢" <br />2 '/2" <br />2 %:" <br />3" x 2 '/2" <br />Length of Piping Run: <br />Approx. 115' <br />Approx. 210' <br />Approx. 210' <br />Approx. 240' <br />Product Stored: <br />Diesel <br />Premium <br />Regular <br />Gasoline Vapor <br />Method and location of <br />piping -run isolation: <br />Test boot at STP <br />Piping Sump #1 <br />Test boot at STP <br />Piping Sump #2 <br />Test boot at STP <br />Piping Sump #3 <br />Test boot at <br />Fill Riser Sum #1 <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />9:10 <br />9:20 <br />9:30 <br />9:40 <br />Initial Reading (Ri): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: <br />10:10 <br />10:20 <br />10:30 <br />10:40 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Ri): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No loss in Psi <br />No loss in Psi <br />No loss in Psi <br />No loss in Psi <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.