Laserfiche WebLink
05/15/2008 THU 13: 51 FAX 2094683433 SJC EHD U001 <br /> ********************* <br /> *** FAX TX REPORT *** <br /> ********************* <br /> TRANSMISSION OK <br /> JOB NO. 1334 <br /> DESTINATION ADDRESS 94616342 <br /> PSWD/SUBADDRESS <br /> DESTINATION ID Elite IV <br /> ST. TIME 05/15 13:49 <br /> USAGE T 01' 34 <br /> PGS. 5 <br /> RESULT OK <br /> San Joaquin County DIRECTOR <br /> Donna Heran,REHS <br /> Environmental Health Department Donna <br /> H ran,REHS <br /> 600 East Main Street OR <br /> Laurie Cotulla,REHS <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> :• Carl Borgman,REHS <br /> Mike Huggins,REHS,RDI <br /> Website:www.sjgov.org/ehd Margaret Lagorio,REHS <br /> Phone: (209)468-3420 Robert McClellon,REHS <br /> Fax: (209)464-0138 Jeff Carruesco,REHS,RDI <br /> Kasey Foley,REHS <br /> May 15, 2008 <br /> Carrie Miller Sent by: Fax and Mail <br /> Elite IV Contractors <br /> 2535 Wigwam Drive <br /> Stockton, CA 95205 <br /> Fax: 209-461-6342 <br /> RE: Thornton Rd 76,8606 Thornton Road,Stockton (SR0054248) <br /> The San Joaquin County Environmental Health Department(EHD)has completed the <br /> review of the application for permit to install an OPW 1 C-2100C-DEVR direct burial <br /> spill bucket on the 89 product fill riser, a 794390-409 interstitial sensor in the 89 product <br /> tank, a VMI 99-LD2000 line leak detector on the 89 product line and if needed,an OPW <br /> 61 SO-410C-EVR drop tube on the 89 product tank at the above noted address. <br /> The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution <br /> Control District for any applicable permits and requirements. <br /> 2. Contact Garrett Backus to arrange the following inspections(a 48 hour notice is <br /> required): <br /> a. Verify corrosion protection on the 89 fill riser before back filling. <br /> b. One hour hydrostatic test(or equivalent)on the 89 product spill bucket. <br /> c. Verify the five gallon capacity and drain valve operation of the 89 product <br /> spill bucket. <br /> d. Functionality test of the 89 product tank annular liquid sensor. <br /> e. Functionality test of the 89 product line leak detector(3 gallon per hour at <br /> 10 psi leak test). <br /> f. Inspection of the 89 product drop tube to verify the 95%tank volume <br />