My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2300 - Underground Storage Tank Program
>
PR0232261
>
COMPLIANCE INFO 2007 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:19:49 PM
Creation date
11/8/2018 9:54:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2010
RECORD_ID
PR0232261
PE
2361
FACILITY_ID
FA0002590
FACILITY_NAME
THORNTON 76
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\THORNTON\8606\PR0232261\COMPLIANCE INFO 2007 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2010
QuestysRecordDate
2/27/2018 5:13:36 PM
QuestysRecordID
3808429
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> ASSEMBLY INSTRUCTIONS upper drop tuba. .ake sure coverage is completely <br /> y <br /> Measuring Stick STEP 3: CUT THE UPPER DROP TUBE around the tube as shown in Fig. 5. <br /> IMPORTANT: Each of the numbered steps in the Carefully saw through the tube squarely, at the mark <br /> installation instructions are designed as a CHECK made in Step 2. Use a hacksaw with a new tine- STEP 6: INSTALL INLET <br /> LIST to insure proper installation and trouble free tooth blade. Rotating the upper tube as the sawing TUBE <br /> operation of the OPW 61 SO Overfill Prevention progresses will minimize run out and ensure a Install o-ring in the o-ring <br /> Valve. square 90-degree cut. A piece of paper, taped groove of inlet tube(DO <br /> square with the tube or a hose clamp can be use as NOT USE GREASE). <br /> Read and follow these steps carefully, checking Riser guides for making a square cut. Insert the inlet tube into <br /> them off as you proceed. Pipe with (A) (B) CAUTION -DO NOT use a pipe or tubing cutter to the upper tube until it <br /> FSA400 To Tank To Tank cut the upper drop tube, this may damage the tube, seats against the flange <br /> Figure numbers correspond to step numbers for Top(I.D.) so�tam causing it to be out of round thereby prohibiting on the upper inlet tube. Install <br /> n G loo a ing <br /> easy reference. assembly of the unit. <br /> STEP 1: MEASURE STEP 7: DRILL HOLES Figure 6 <br /> Install the.OPW FSA-400 Face Seal Adaptor and'the With the inlet tube in place, carefully drill (3) 118" <br /> 1-2100-EVR Series Thread-on Spill Container on the Figure 1 diameter pilot holes through the drop tube and inlet <br /> Fill Riser(Refer to the Installation Instructions tube at three locations at 120 degree intervals <br /> Supplied with the 1-2100-EVR Series Spill ; around the tube, 1 inch below the flange. Using the <br /> Container). Insert the 61SO measuring stick pilot holes, drill (3) 5116"dia. holes through the <br /> tubes. Remove the burrs from the drilling operation <br /> through the riser pipe and hook it under the inside of Jj` <br /> the tank in the lengthwise direction. Mark the �----� from the inside of the drop tube assembly with a fine <br /> measuring stick at the top of the FSA-400 threads 4"Ripple half round file. <br /> inside the base of the spill container bucket just IMPORTANT:A 5116! drill bit must be used.. Da not <br /> below the drain valve outlet window(See Figure 1 substitute any other size drill bit. <br /> &1A). The top flange on the 61SO will rest on the , <br /> FSA-400 just below the drain valve outlet, and be <br /> locked in place between the FSA-400 and the 4" Cut Line <br /> nipple that is installed in the spill container with the o v` <br /> 61 JSK-4400 Jack Screw Kit(See Figure 1A). (For 1-2100 EVR <br /> riser pipe configurations other than that shown, spill Container Figure 3 <br /> consult installation drawings or use other necessary <br /> � 61J5K-4400 <br /> „ <br /> means to measure Dimension"A"). Mark Measuring Jack screw STEP 4: FILE THE DROP TUBE <br /> Stick Here for File the upper tube square, <br /> Using a tape measure, measure the distance from CARe EVR 6150-EVR FSA400 and remove any burrs orInsta � <br /> the top of the FSA-400 in the spill container to the (Top of FSA-400) <br /> Face Seal rough edges. Make sure the <br /> bottom of the tank(Dim. "B"). (Top of FSA-400) AdapEer cuts fiat and square. <br /> IMPORTANT: Inspect the riser pipe for any foreign Figure 1A IMPORTANT: Carefully file a - - Figure 7 <br /> material. Over spray from tank relining or any good chamfer on the inside <br /> internal burrs inside of pipe must be removed prior of the drop tube to provide a <br /> to installation. Failure to have an unobstructed riser , lead-in for the o-ring and inlet STEP 8: ASSEMBLE <br /> pipe may prevent proper installation and operation of Measuring tube to be installed in step 6. AND SEAL CLINCH <br /> the valve. The 61 SO is designed to be installed into Stick STUDS \ Apply Sealant <br /> schedule 40 riser pipes. The 61SO cannot be Caution: Failure to Figure 4 Loosely assemble the <br /> installed into schedule 80 riser pipes. properly apply and cure three(3) clinch studs, <br /> STEP 2: MARK THE TUBE sealant may result,in a % lock washers, and nuts \ <br /> Transfer Mark failure of a pressure in holes. Do not tighten <br /> Use the result from STEP 1 and HOW TO LOCATE � <br /> From Stick to decay leak test. at this time. Mix up a <br /> THE POSITION OF THE 61 SO AT 96%TANK Upper Tube small amount of <br /> CAPACITY to mark the upper tube. Measure the (Cut Line) STEP 5: APPLY SEALANT sealant. Generously <br /> distance from the point where the upper tube and Prepare sealant by apply sealant <br /> valve body meets as shown in Figure 2. thoroughly mixing 113 of --- underneath each clinch <br /> Seam each packet together until stud head, each nut, <br /> color is uniform. and on the outside of <br /> Figure 2 Generously apply sealant to the tube around the Figure.8' <br /> the inside diameter of the Figure 5 holes. <br /> OPW 61 SO Overkill Prevention Valve Page 4 y OPW 61 SO Overfill Prevention Valve Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.