Laserfiche WebLink
used for the riser, the 61 SO can not be installed. If vapor Recovery <br /> GENERAL INSTRUCTIONS seamed pipe has been used, the internal weld bead Riser Fill Riser I <br /> Normal Operation: A Hose"Kick"and reduced flow may interfere with the OPW 61 SO and prevent <br /> The OPW 61 SO Overfill Prevention Valve is signal that the tank is full. Close transport delivery installation. If the OPW 61 SO won't slip in easily <br /> designed for tight fill, gravity drop applications to valve and-drain hose into tank before disconnecting DON'T FORCE IT] Damage to the valve may result <br /> he[ prevent accidental or Intentional overfilling of an hose fittin if excess force is used. Examine the riser pipe <br /> P P g Y 9 6•L I <br /> underground storage tanks. It is installed in the UST carefully; determine the nature of the obstruction; <br /> - ; <br /> drop tube in place of a standard drop tube. Overfilled Tank: Failure of the hose to drain after take appropriate steps to remove it. oPw53vML 1 <br /> i <br /> The main 61 SO valve closes when liquid level is at closing the delivery valve signals an overfilled tank. sal <br /> 95%of the top of the tank. A small bypass valve Do Not Disconnect any delivery hose fitting until the <br /> remains open to allow the delivery hose to drain at liquid level in the tank has been lowered to allow the STEP 15: CHECK rule cul 13'Minimum <br /> 3-5 gallons per minute. If the delivery truck valve is hose to drain into the tank. Attention: In the event INSTALLATION per Focal Floarance for <br /> not closed after initial shut-off,the bypass valve will you are splashed, remove all wetted clothing Insert the drop tube all the Requirements <br /> close and will restrict all fuel delivery. immediately. Do not go into an enclosed area and way into the tank until the - -- <br /> stay away from ignition sources. flange and gasket seat Y 6•(oras per local requirements) <br /> The 61 SO-EVR models of the 61 SO are designed to onto the top of the FSA- -- <br /> be installed with the following OPW products: FSA- IMPORTANT 400. The fioat will swing F�Arign Float Along Length of Tank —� <br /> 400 Face Seal Adapter, 1-2100-EVR Series Spill Determine if the underground storage tank is out into the at <br /> Container or POMECO Multi-port, 61JSK Jack equipped with a ball float vent valve similar to position as it passes into Figure 16 <br /> Screw Kit, 61 SALP-EVR Series Rotatable Product the OPW 53VML, as illustrated in Figure 16. In all the tank. <br /> Adaptor, and 634TT-EVR Series Product Cap. reached befaretdlrfis,the hthe balloint of floatfloat reduces <br /> O flow�ost be <br /> Make aligned along the le that the ength oat is <br /> IMPORTANT ensure proper overfill valve operation. of the tank. The length of <br /> Read these assembly and installation instructions the tank can easily be <br /> completely and carefully prior to starting. Check to determined by locating [ 81SALP <br /> make sure all parts have been provided. Use only TOOLS NEEDED FOR INSTALLATION AND other manholes or pump <br /> Rotatableot <br /> the parts supplied; substitution of parts may cause ASSEMBLY: boxes that are installed Adaptor <br /> product failure. 1. Drill around other tank fittings. <br /> 2. A sharp 118"pilot drill bit Look into the drop tube <br /> Failure to follow instructions may cause improper 3. A sharp 5116"drill bit and align the deflector <br /> product operation or premature failure which may 4. Tape measure with the length of the tank. Figure 15 ,❑ic-ztoo <br /> permit storage tank overfill. An overfilled storage 5. Hacksaw or cut-off saw,fine tooth; 24 teethlinch CAUTION: No obstruction Fi 9 <br /> Drain valve 1-2100 <br /> tank may create hazardous conditions and/or 6. Fine half round file in the tank can be within o series <br /> environmental contamination. 7. Screwdriver- Phillips blade 13"from the center of the riser pipe or the valve may Cconane� <br /> 8. %z"Wrench or socket not operate properly. 61JSK-"00 rsA400Face <br /> CAUTION 9. Two-part sealant(Supplied) Jack Screw. <br /> p ( pp ) �t Seal Adaptor <br /> Do not remove elastic band from around float until 10. Torque Wrench STEP 16: ALiGN VALVE <br /> instructed to do so, as damage to valve may result. Install the OPW JSK-4400 Jack Screw Kit and a 4" Figure 16A <br /> WARNING nipple to lock the valve in place. Refer to the i <br /> WARNING Using electrically operated equipment near gasoline Installation Instructions supplied with the Jack Screw STEP 17: INSTALL WARNING <br /> Failure to properly connect delivery hose and elbow, or gasoline vapors may result in fire or explosion, Kit. install the 61 SALP-EVR Rotatable Product Pi-ATE 1 <br /> and/or disconnecting a liquid filled delivery hose or causing personal injury and property damage. Adaptor(Refer to Installation Instructions supplied Slide the tie wrap over the <br /> elbow will result in a hazardous spill, which may Check to assure the working area is free from such with the 61 SALP-EVR.) Make sure that the valve warning plate ears and.position <br /> result in personal injury, property damage,fire, hazards, and always use proper precautions. does not rotate while tightening the adaptor by warning plate against riser pipe <br /> explosion, and water and soil pollution. observing the position of.the deflector. The valve approximately 1" below the <br /> * must remain aligned along the length of the tank adaptor. Tighten the tie wrap <br /> Make sure all connections, including the hose IMPORTANT: The figures in this installation and as in Ste 15. Repeat this step as necessary to <br /> and elbow connections, between storage tank maintenance instruction may contain vapor recovery p P P ry securely. The valve is now fully <br /> and transport are secure/ coupled. assure proper valve alignment. installed and in operating <br /> P Y P equipment(including model numbers}that is not <br /> * Make sure the lip seal and/or all gaskets in the certified by the California Air Resources Board position• <br /> delivery elbow are properly in place to prevent (CARE)for a specific Phase 1 Vapor Recovery �I <br /> spills. System. Please refer to Exhibit 1 of the appropriate STEP 18:VALVE REMOVAL <br /> * Do not operate with damaged or missing parts, CARB Phase I Executive Order for a list of certified The valve can be removed for Figure 17 �! <br /> which prevent tight connections. Phase I Vapor Recovery System Equipment. tank.leak testing, inspection, <br /> etc., by removing the 61 SALP-EVR Rotatable 1 <br /> Product Adaptor, the 4" nipple, and the 61JSK4400 <br /> Jack Screw Kit. Reinstall per the above instructions. <br /> OPW 61 SO Overfill Prevention Valve -Page 2 OPW 61 SO Overfill Prevention Valve Page 7 <br />