Laserfiche WebLink
SWRCB,January 2002 • • Page 4 . <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard Professional Engineer <br /> El Other (Specify) <br /> Test Method Used: ❑ Pressure Vacuum Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: vp1t Equipment Resolution: •05gph <br /> Sump# 1 Sump# 2 Sump# 3 Sump# <br /> Sump Diameter: not 4811 48" <br /> Sump Depth: tested 53" 53" <br /> Sump Material: fiberglass fiberglass <br /> Height from Tank Top to Top of 2011 20" <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 2 0" 2011 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good <br /> Portion of Sump Tested: 1 2211 2211 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both E]Yes E]No�N MYes�No�N EYes�No�N Yes[]No�l <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 secs 2-5 sec s <br /> Is system programmed for fail-safe ❑ ❑ <br /> shutdown?* Yes N X N X❑ ❑Yes No[:]N X❑ ❑Yes No[::]N X❑ ❑Yes No <br /> Was fail-safe verified to be ❑ ❑ F___1 <br /> ❑ ❑ F___1 <br /> ❑ ❑ F___1 <br /> ❑ ❑ <br /> operational?* Yes N X N [flYes N X N Yes N X N Yes No X <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min <br /> test: <br /> Test Start Time: 8:2 0 8:16 <br /> Initial Reading(R1): .741 10.238 <br /> Test End Time: 8:50 8 :4 6 <br /> Final Reading(RF): .592 10.18 7 <br /> Test Duration: 30 min 30 min <br /> Change in Reading(RF-R1 ): .012gph .004gph <br /> Pass/Fail Threshold or Criteria: .05gph .05gph <br /> g ElPWmwass 1, �1 <br /> Was sensor removed for testing? �YesE]NoE]NA EYes❑NoE]NA EYes❑NoE]NA[]Yes E]No[T <br /> Was sensor properly replaced and �E]YesE]Nq_��JNA <br /> F___1 <br /> ❑ � ❑ ❑ []No[_ <br /> V <br /> verified functional after testing? X Ye N NA X Ye N NA Yes <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> starting and ending values are taken off the vplt <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is "NO" or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />