Laserfiche WebLink
SWRCB,January 2002 i Page 5 <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard X❑ Professional Engineer <br /> Other (Specify) <br /> Test Method Used: Pressure ❑ Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: vp1t Equipment Resolution: .05gph <br /> UDC# 1/2 UDC# 3/4 UDC# UDC# <br /> UDC Manufacturer: bravo bravo <br /> UDC Material: metal metal <br /> UDC Depth: 81, 811 <br /> Height from UDC Top to Top of 01' 01, <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 01, off <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: good good <br /> Portion of UDC Tested: 1 211 211 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both XUYes UNoUN ❑Yes UNo❑N ❑Yes UNoUN []Yes UNoa <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 secs 2-5 sec s <br /> Is system programmed for fail-safe ❑ ❑ � [:]Yes <br /> X] ^ ❑ ❑ � []Yes <br /> ❑ <br /> shutdown?* Yes N N Yes NUON Yes N N Yes No <br /> Was fail-safe verified to be ❑ ❑ " ❑ ❑ ^ [:]Yes <br /> ❑ � ❑ ❑ <br /> operational?* Yes N �N Yes NOUN Yes X N N Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min <br /> test: <br /> Test Start Time: 9:2 5 9:2 7- <br /> Initial Reading(R1): 8.489 3 .734 <br /> Test End Time: 9:40 9:42 <br /> Final Reading(RF): 8.465 3.658 <br /> Test Duration: 15 min 15 min <br /> Change in Reading(R F-R1 ): .0 0 2 gph .0 0 9hph <br /> Pass/Fail Threshold or Criteria: .05gph 05gph <br /> T Lw ',. ✓�yi--i a fi`dIri i .5 1[ <br /> Was sensor removed for testing. ❑Yes N^^�� ❑ X❑ ❑ ❑ []Yes❑NA Yes N NA Yes N NA No <br /> F7_--1 <br /> "U <br /> Was sensor properly replaced and ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> verified functional after testing? Ye N NA Ye N NA Ye N NA Yes N <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> staring and ending values are taken off the vplt <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is "NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />