Laserfiche WebLink
0 <br />SWRCB, January 2002 <br />TANK ANNULAR TESTING <br />Page ), of IL <br />Test Method Developed By: X Tank Manufacturer 0 Industry Standard D Professional Engineer <br />0 Other (Spec) <br />Test Method Used: 0 Pressure X Vacuum D Hydrostatic <br />0 Other (Spec) <br />Test Equipment Used: Gast Vacuum Pump/Vacuum Gauges in Hg. Equipment Resolution -1/2-301-1g. <br />' e Tank # 1 Tank # 2 Tank #3 Tank # <br />}a <br />Is Tank Exempt From Testing?' 0 Yes x No <br />0 Yes x No <br />D Yes x No <br />D Yes ❑ No <br />Tank Capacity: lOK <br />lOK <br />10K <br />Tank Material: Fiberglass <br />Fiberglass <br />Fiberglass <br />Tank Manufacturer: XERXES <br />XERXES <br />XERXES <br />Product Stored: Super 91 <br />Diesel <br />Regular 87 <br />Wait time between applying 1 Hour <br />vacuum and starting test: <br />Test Start Time: 9:30 <br />I Hour <br />9:30 <br />IHour <br />9:30 <br />_ <br />Initial Reading (RI): -IOHg. <br />-IOHg. <br />-10 Hg. <br />Test End Time: 10:30 <br />10:30 <br />10:30 <br />(RF): -IOHg. <br />-IOHg. <br />-IOHg. <br />n: 1Hour <br />lHour <br />1 Hour <br />eading (RF-Ri): OHg. <br />0 Hg. <br />0 Hg. <br />readng <br />hreshold or Criteria: >-2 Hg. <br />>-2 Hg. <br />>-2 Hg•lt: <br />X Pass 0 Fail <br />X Pass ❑ Fail <br />X Pass❑Fail <br />❑Pass ❑Fail <br />removed for testing? Yes X No NA <br />Yes X No NA <br />Yes X No NA <br />❑ Yes 0 No ❑ NA <br />Was sensor properly replaced and Yes No X NA <br />verified functional after testin ? <br />Yes No X NA <br />Yes 0 No X NA <br />0 Yes 0 No 0 NA <br />Comments (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. tCalifornia Code of Regulations, Title 23, Section 2637(a)(6)) <br />