My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2300 - Underground Storage Tank Program
>
PR0232261
>
COMPLIANCE INFO 2007 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:19:49 PM
Creation date
11/8/2018 9:54:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2010
RECORD_ID
PR0232261
PE
2361
FACILITY_ID
FA0002590
FACILITY_NAME
THORNTON 76
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\THORNTON\8606\PR0232261\COMPLIANCE INFO 2007 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2010
QuestysRecordDate
2/27/2018 5:13:36 PM
QuestysRecordID
3808429
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />0 <br />5_ qrr. lNDARY PTPF, TESTING <br />Page 3 of_]_ <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in PSI/Nitrogen <br />Equipment Resolution: I/10-15 PSI <br />,,,,�.. l ' . Cni7 '.tl'"iG" .k;i?..l <br />E ° § <br />,Piping Run #1 <br />. n. _ .. .. ' . - , s <br />Piping Run #Z <br />•. '.Ca... , ae:G i„ F...,.:.. . "7aia <br />Piping Run #3 <br />arf r 1 . %wF , <br />Piping Run <br />Piping Material: Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: Smith <br />Smith <br />Smith <br />Piping Diameter: 3" <br />3" <br />311 <br />Length of Piping Run: Approx. 75' <br />Approx. 85' <br />Approx. 65' <br />Product Stored: Super 91 <br />Plus 89 <br />Regular 87 <br />Method and location of Test boot at STP# 1 <br />piping -run isolation: <br />Test boot at STP#2 <br />Test boot at STP#3 <br />Wait time between applying 30 Minutes <br />pressure and starting test: <br />30 Minutes <br />30 Minutes <br />'fest Start Time: 8:50 <br />8:40 <br />9:00 <br />Initial Reading (Ri): 3 PSI <br />3 PSI <br />3 PSI <br />Test End Time: 9:50 <br />9:40 <br />10:00 <br />Final Reading (RF): 3 PSI <br />3 PSI <br />3 PSI <br />Test Duration: I Hour <br />1 Hour <br />I Hour <br />Change in Reading (RF-Rj): 0 PSI <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or No Loss in PSI <br />Criteria: <br />No Loss in PSI <br />No Loss in PSI <br />Test Result: X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />Pass Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.