My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2300 - Underground Storage Tank Program
>
PR0232261
>
COMPLIANCE INFO 2007 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:19:49 PM
Creation date
11/8/2018 9:54:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2010
RECORD_ID
PR0232261
PE
2361
FACILITY_ID
FA0002590
FACILITY_NAME
THORNTON 76
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\THORNTON\8606\PR0232261\COMPLIANCE INFO 2007 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2010
QuestysRecordDate
2/27/2018 5:13:36 PM
QuestysRecordID
3808429
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Is <br />• <br />Page I of I <br />n onr7 z /rvtT `DT.ii i d-r%WTA1rNM1WNT R(1XFS <br />Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />Spill/Overfill Boxes tested annually with Monitoring System Certification. <br />7• Vl iLL/ V � aJa�a iyL v - --- - - <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested (See Comments below!) <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer ❑ Industry Standard [I Professional Engineer <br />❑ Other (Specify) <br />Fest Method Used: <br />❑ Pressure ❑Vacuum ❑Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used <br />Equipment Resolution: <br />wE �'7 'ti 5' <br />Aw <br />s'�54' •: ? ,'41:#aP r. d.: .'" '.: <br />Spill Box # Spill Box # <br />Spill Box # Spill Box # <br />tk wcH <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Duration: <br />nge in Reading (RF-Rj): <br />F <br />/Fail Threshold or <br />eria: <br />Test Result: <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />Spill/Overfill Boxes tested annually with Monitoring System Certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.