Laserfiche WebLink
• i <br /> • The proposed haul route to Forward Landfill is as follows: the Truck will proceed from the <br /> site to Interstate 205, heading east to Interstate 5. Then, it will take Interstate 5-north and <br /> exit east at French Camp Road. It will travel about 10 miles until it reaches Austin Road <br /> where it turn left. The truck will travel about two miles on Austin Road to Forward Landfill, <br /> California. <br /> • <br /> F-2 <br />