My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
29633
>
2300 - Underground Storage Tank Program
>
PR0231422
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 3:45:46 PM
Creation date
11/8/2018 9:54:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231422
PE
2381
FACILITY_ID
FA0003781
FACILITY_NAME
TRACY AIRPORT
STREET_NUMBER
29633
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
25311031
CURRENT_STATUS
02
SITE_LOCATION
29633 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\29633\PR0231422\REMOVAL 1995 .PDF
QuestysFileName
REMOVAL 1995
QuestysRecordDate
8/22/2017 7:03:09 PM
QuestysRecordID
3601039
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION <br /> QUALITY CONTROL PLAN <br /> 11.0 INTRODUCTION <br /> This Site-specific Quality Control (QC) Plan is designed to cover the field activities <br /> associated with removal of underground storage tank, piping, and contaminated soil at <br /> Tracy Auxiliary Field No. 5, Tracy, California. Field sampling and laboratory quality control <br /> procedures are described in the CDQMP of the GMP. <br /> This plan contains only QC objectives and organization; other components of a QC plan <br /> are included in the QC plan of the GMP. These components include: <br /> • Management of Subcontractors <br /> • Material Review Submittals <br /> • Control Practices <br /> • Inspections and Testing <br /> • Documentation <br /> Daily QC Report Form for field activities and Peer Review Form for document review are <br /> . included as Attachment 1. <br /> 12.0 QUALITY CONTROL OBJECTIVES <br /> The objective of a QC Program is to provide a framework where a quality end product can <br /> be produced. All levels of the organization must be developed that avoid conflicts of <br /> interest. Procedures must be followed to assure uniformity, standardize jobs, and provide <br /> a standard by which comparisons can be made. Programs must be developed that allow <br /> non-conformances to be discovered and corrected. Finally, a documentation system <br /> recording all data, non-conformances, and corrective actions need to be incorporated into <br /> the QC program. <br /> 13.0 ORGANIZATION <br /> The overall QA/QC responsibility rests with the CQC Manager (QCM). The QCM will <br /> delegate specific tasks to qualified individuals within the organizational chart (Figure 1-1) <br /> both on and off the project site. <br /> Because the project start date is presently uncertain, there is a possibility that field <br /> personnel may change. CKY will notify the COR and provide the Corps of Engineers with <br /> resumes outlining qualifications, training, and related experience of the new personnel for <br /> review and approval. <br /> • <br /> I-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.