• removing the tank to prevent any spillage inside the excavation. A bermed <br /> and plastic lined area will be constructed adjacent to the excavation to <br /> receive excavated material. Muddy soil and free water will be contained in <br /> this lined area. Discharge control measures for runon and runoff specified <br /> in Section E5.0 will be utilized. Groundwater will be pumped and stored in <br /> a temporary containment (drum, pan, or baker tank) as necessary during <br /> the excavation only if it is authorized by the COR. Pumping groundwater <br /> during the excavation is not in the scope of work for this Delivery Order. <br /> Padilla's Comments: <br /> 1. Page A-5 <br /> Mr. Chris Prescott, COE technical manager, indicated that no resurfacing is required <br /> after compaction. <br /> 2. Page A-6 <br /> Task 4 Removal and Disposal of Tank and Contents includes activities for site <br /> restoration and demobilization. <br /> 3. Attachment No. 6 <br /> Please insert the revised Emergency Telephone List from Attachment 2 of this letter to <br /> the PWP. <br /> 4. Material Handling Plan - Page F-1 <br /> Copies of current licenses, registrations and permits for Erickson, Inc., Gibson <br /> Environmental, R. Bauerle Trucking, and Forward Landfill are included in the GMP, at <br /> the end of Section D, Safety and Health Program, Disposal Facilities Attachment. <br /> 5. Page G-1, paragraph G1.0 <br /> Please insert copy of the land surveyor's license from Attachment 2 of this letter to the <br /> PWP. <br /> 6. Page 1-1 <br /> CKY's project organization chart has been revised, due to scheduling conflict. A new <br /> project organization chart and new project personnel's resumes are provided for your <br /> review (Attachment 1). <br /> 3 <br />