My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
29633
>
2300 - Underground Storage Tank Program
>
PR0231422
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 3:45:46 PM
Creation date
11/8/2018 9:54:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231422
PE
2381
FACILITY_ID
FA0003781
FACILITY_NAME
TRACY AIRPORT
STREET_NUMBER
29633
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
25311031
CURRENT_STATUS
02
SITE_LOCATION
29633 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\29633\PR0231422\REMOVAL 1995 .PDF
QuestysFileName
REMOVAL 1995
QuestysRecordDate
8/22/2017 7:03:09 PM
QuestysRecordID
3601039
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Perry's Comments: <br /> • 1. As addressed in the paragraph 13.0 Organization, the overall QA/QC <br /> responsibility rests with the QCM. In others words, QCM will be responsible for <br /> coordinating all laboratory elements. The PM, working with the QCM, will make sure that <br /> reports are reviewed and submitted promptly. <br /> 2. Construction Testing and Engineering, Inc. will be performing the materials <br /> (compaction) testing for this project. Their qualifications are provided in Attachment 2 of <br /> this letter. <br /> 3. The truck will exit the site and proceed north on Corral Hollow Road. It will travel <br /> about 5 miles on Corral Hollow Road to Interstate 205. <br /> 4. CKY is currently in the process of reviewing suppliers for borrow materials. We <br /> will provide borrow material information on ENG Form 4025. <br /> If you should have any questions or comments, please feel free to contact us. <br /> Very truly yours, <br /> �p <br /> Tan Phung, Ph.D.,_ <br /> Principal Scientist <br /> Attachments <br /> • <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.