Laserfiche WebLink
t i <br /> t � <br /> STEP 12: FIRST FLARING ROLLER POSITION STEP 14: 45– 90 DEGREE FLARING POSITION STEP 2 Determine the total height of the Fill <br /> The first position for the flaring roller is in the 0–45 Install the flaring roller in the 45–90 degree position (product) riser height with the MIF 4X4 riser adapter FILL SPILL CONTAINER DROP TUBE GUIDE <br /> degrees position. Use the long hex screw to connect using the short hex screw. See photo below. iinstalled. See Figure 1, Measurement "A" Flsht3rada <br /> the flaring roller to the flaring tool. See the following <br /> two photos below for correct position. (Note.- Both the fill riser and M/F 4X4 riser adapter <br /> must be installed and correctly torqued,) 7. :E <br /> 4 <br /> ` To determine the fill riser (height, M/F 4X4 riser <br /> - i• • - -- g Allow Approximately 16 3/W for the 85000-i Series Spill Container <br /> adapter must he installed) take a tape measure and and 17 114'for the 85000 Series Spill Container from <br /> measure from inside the installed fill riser, (hook the the Top of the M/F 4X4 Riser Adaptor To Finish Grade <br /> tape on the end of the riser or onthe inside top of <br /> x t 1 <br /> tanit' and measure from the bottom end of the fill riser W4x4RlserAdaptor <br /> }` to the top of the MIF 4X4 threaded riser adapter i <br /> - Measure the Length of <br /> installed on top of the riser. the Tank Riser with the <br /> r l M/F 4X4 Ryser Ada for <br /> This is measurement "A" % p <br /> �. d ) Ir1CIleS installed from fheTopafT000gw atefor[henagrtvrtne <br /> the Tank to the Top of the fir 4X4 Riser Adaptor,reduce the <br /> . 6*1 of your tank eiwr by 1314'. <br /> x STEP 2a To determine the total drop tube length, Riser Adaptor, R. <br /> ,- �x _ �,' take the tape measure and measure from inside the Note:IfmisUST has a <br /> .t. f ' fill riser from the bottom of the tank to the to of the Manway and the Rt Riser Is <br /> p Installed In the top of the 4-Steel Tank fuser <br /> t MIF 4X4 riser adapter. manway cover you Most ADD <br /> STEP 15: PERFORMING - 46--90 DEGREE FLARE the ha;ghtoftheinarmayto <br /> Turn the short hex screw until it is snug. While turning This is Measurement "B"( inches cyour orrectly set the overfillvaNe. Top ofStorage Tank <br /> the Flaring Tool Handle, slowly tighten the short hex (See Figure 1) B. <br /> screw applying continual pressure until the 90 degree Measure from the Top of the RtserAdaptor <br /> flare is completed. The short hex screw will bottom <br /> to the Bottom of the Tank <br /> , out and become tight. When this happens, STOP STEP 3 Determining the U er Dro Tube Len th Bo OfStaageTank <br /> turning the short hex screw, the 90 degree flare is above the automatic shut-off prevention valve. <br /> complete. Remove the short hex screw and flaring <br /> Figure I <br /> roller, See photo below. Use the final results in inches determined in Step 1 <br /> 41 <br /> ' ( ) and ADD it to measurement "A" from step 4 Determining the total length of the drop tube. <br /> tx After flaring the upper drop tube section take the <br /> Step ? ( ) Go to Table 2. <br /> results of measurement "B" in Step 2a <br /> TABLE 2 ( }, <br /> ea <br /> The final results from Step 1 <br /> and subtract 6 or less inches <br /> u Starting at the flare end (upper section) measure the <br /> Measurement "A" Step 2 ADD + ( � <br /> STEP 13: PERFORMING 0 –45 DEGREE FLARE , } entire length of the drop tube from the top down to <br /> Turn the long hex screw until it is snug. While turning UPPER ©ROP TUBE LENGTH <br /> the Flaring Tool Handle, slowly tighten the long hex f ! ( ) the bottom and mark this measurement near the <br /> screw applying continual pressure until a 45 degree <br /> bottom portion of the drop tube. This <br /> flare is made. The hex screw will bottom out and .;: I This is the exact length,the top section of the p p well be your cut <br /> aluminum drop become tight. When this happens stop turning the �"°'� p tube should be above the automatic line for the bottom portion of the drop tube. Go to <br /> long hex screw, the first half of the flare is complete. shut-off valve for this tank installation. Table 3 <br /> Remove the long hex screw and Flaring roller. NOTE: if this UST has a manway and the fill riser <br /> .. � TABLE 3 <br /> is installed in the top of the manway you must <br /> add the height of the manway to your fill riser Measurement "B" from Step 2a ( ) <br /> i length "A" for the shut-off valve to be set the Less 6" inches or focal regulatory amount —( ) <br /> correct distance below the top of the tank. <br /> i See the Flaring Tool Instructions for cutting and TOTAL_ DROP TUBE LENGTH = ( ) <br /> 17 <br /> flaring the upper drop tube. Hint: Use 5 718"inches in lieu of 6"inches to ensure <br /> i you do not exceed 6"inches. To make a perfectly <br /> straight cut follow the Flaring Tool instructions while <br /> using the flaring tool cutter to make this cut. Place the <br /> i <br /> S cutting blade directly on the marked cut line and make <br /> your cert, <br /> s <br /> i <br /> i <br />