My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
COMPLIANCE INFO 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:19:01 PM
Creation date
11/8/2018 9:55:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\3775\PR0231418\COMPLIANCE INFO\COMPLIANCE INFO 2012-2015.PDF
QuestysFileName
COMPLIANCE INFO 2012-2015
QuestysRecordDate
10/10/2017 8:57:48 PM
QuestysRecordID
3096410
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t i <br /> t � <br /> STEP 12: FIRST FLARING ROLLER POSITION STEP 14: 45– 90 DEGREE FLARING POSITION STEP 2 Determine the total height of the Fill <br /> The first position for the flaring roller is in the 0–45 Install the flaring roller in the 45–90 degree position (product) riser height with the MIF 4X4 riser adapter FILL SPILL CONTAINER DROP TUBE GUIDE <br /> degrees position. Use the long hex screw to connect using the short hex screw. See photo below. iinstalled. See Figure 1, Measurement "A" Flsht3rada <br /> the flaring roller to the flaring tool. See the following <br /> two photos below for correct position. (Note.- Both the fill riser and M/F 4X4 riser adapter <br /> must be installed and correctly torqued,) 7. :E <br /> 4 <br /> ` To determine the fill riser (height, M/F 4X4 riser <br /> - i• • - -- g Allow Approximately 16 3/W for the 85000-i Series Spill Container <br /> adapter must he installed) take a tape measure and and 17 114'for the 85000 Series Spill Container from <br /> measure from inside the installed fill riser, (hook the the Top of the M/F 4X4 Riser Adaptor To Finish Grade <br /> tape on the end of the riser or onthe inside top of <br /> x t 1 <br /> tanit' and measure from the bottom end of the fill riser W4x4RlserAdaptor <br /> }` to the top of the MIF 4X4 threaded riser adapter i <br /> - Measure the Length of <br /> installed on top of the riser. the Tank Riser with the <br /> r l M/F 4X4 Ryser Ada for <br /> This is measurement "A" % p <br /> �. d ) Ir1CIleS installed from fheTopafT000gw atefor[henagrtvrtne <br /> the Tank to the Top of the fir 4X4 Riser Adaptor,reduce the <br /> . 6*1 of your tank eiwr by 1314'. <br /> x STEP 2a To determine the total drop tube length, Riser Adaptor, R. <br /> ,- �x _ �,' take the tape measure and measure from inside the Note:IfmisUST has a <br /> .t. f ' fill riser from the bottom of the tank to the to of the Manway and the Rt Riser Is <br /> p Installed In the top of the 4-Steel Tank fuser <br /> t MIF 4X4 riser adapter. manway cover you Most ADD <br /> STEP 15: PERFORMING - 46--90 DEGREE FLARE the ha;ghtoftheinarmayto <br /> Turn the short hex screw until it is snug. While turning This is Measurement "B"( inches cyour orrectly set the overfillvaNe. Top ofStorage Tank <br /> the Flaring Tool Handle, slowly tighten the short hex (See Figure 1) B. <br /> screw applying continual pressure until the 90 degree Measure from the Top of the RtserAdaptor <br /> flare is completed. The short hex screw will bottom <br /> to the Bottom of the Tank <br /> , out and become tight. When this happens, STOP STEP 3 Determining the U er Dro Tube Len th Bo OfStaageTank <br /> turning the short hex screw, the 90 degree flare is above the automatic shut-off prevention valve. <br /> complete. Remove the short hex screw and flaring <br /> Figure I <br /> roller, See photo below. Use the final results in inches determined in Step 1 <br /> 41 <br /> ' ( ) and ADD it to measurement "A" from step 4 Determining the total length of the drop tube. <br /> tx After flaring the upper drop tube section take the <br /> Step ? ( ) Go to Table 2. <br /> results of measurement "B" in Step 2a <br /> TABLE 2 ( }, <br /> ea <br /> The final results from Step 1 <br /> and subtract 6 or less inches <br /> u Starting at the flare end (upper section) measure the <br /> Measurement "A" Step 2 ADD + ( � <br /> STEP 13: PERFORMING 0 –45 DEGREE FLARE , } entire length of the drop tube from the top down to <br /> Turn the long hex screw until it is snug. While turning UPPER ©ROP TUBE LENGTH <br /> the Flaring Tool Handle, slowly tighten the long hex f ! ( ) the bottom and mark this measurement near the <br /> screw applying continual pressure until a 45 degree <br /> bottom portion of the drop tube. This <br /> flare is made. The hex screw will bottom out and .;: I This is the exact length,the top section of the p p well be your cut <br /> aluminum drop become tight. When this happens stop turning the �"°'� p tube should be above the automatic line for the bottom portion of the drop tube. Go to <br /> long hex screw, the first half of the flare is complete. shut-off valve for this tank installation. Table 3 <br /> Remove the long hex screw and Flaring roller. NOTE: if this UST has a manway and the fill riser <br /> .. � TABLE 3 <br /> is installed in the top of the manway you must <br /> add the height of the manway to your fill riser Measurement "B" from Step 2a ( ) <br /> i length "A" for the shut-off valve to be set the Less 6" inches or focal regulatory amount —( ) <br /> correct distance below the top of the tank. <br /> i See the Flaring Tool Instructions for cutting and TOTAL_ DROP TUBE LENGTH = ( ) <br /> 17 <br /> flaring the upper drop tube. Hint: Use 5 718"inches in lieu of 6"inches to ensure <br /> i you do not exceed 6"inches. To make a perfectly <br /> straight cut follow the Flaring Tool instructions while <br /> using the flaring tool cutter to make this cut. Place the <br /> i <br /> S cutting blade directly on the marked cut line and make <br /> your cert, <br /> s <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.