Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> Q � 600 East Main Street Donna Heran,REHS <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco,REHS, RDI <br /> cqP Website: wwwsjgov.org/ehd Kasey Foley,REHS <br /> i F o R Linda Turkatte,REHS <br /> anuary 4, 2012 Phone: (209) 468-3420 <br /> Fax: (209)464-0138 <br /> Glenn Kelley <br /> Wayne Perry Inc <br /> 30 Main Ave, Suite 5 <br /> Sacramento, CA, 95838 <br /> Re: Chevron USA Inc#98264 SR0064074 <br /> 3775 North Tracy Blvd, Tracy, CA, 95304 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to retrofit manways for prevention of water intrusions by removing <br /> existing steel manway lids and installing new manway lids, new Phil-Tite 5 gallon spill buckets, <br /> EBW Autol-imiter II shut-off valves, vapor swivel adaptor and fill swivel adaptors along with new <br /> Blueline sump penetrations on the underground storage tank (UST) system at the above noted <br /> address. The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Contrc <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Thuy Tran at (209) 468-8257 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval. <br /> a. Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic <br /> test (or equivalent). Proper drainage must also be verified. <br /> b. Secondary containment testing on 87, 89, and 91 USTs. <br /> c. 24-hour hydrostatic test(or equivalent) on 87, 89, and 91 Fill and STP sumps if any <br /> penetrations are installed. <br /> d. Overfill prevention verification: Measurement of drop tubes to verify 95% tank volume <br /> shut off. <br /> 4. Since concrete will be broken above the 87, 89 and 91 LISTS, a secondary containment <br /> test must be performed on each of the 87, 89, and 91 USTs once concrete is poured in <br /> accordance with the manufacturer's guidelines. <br /> 5. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br />