Laserfiche WebLink
accordance with local district requirements and pursuant to the policies established by that district. <br /> Exhibit 1 <br /> Local districts may require the use of altemate test form(s),provided they include the same Phil-Tits Phase I Vapor Recovery System Equipment List <br /> minimum parameters identified in the datasheet referenced in the test procedure(s). Alternative test <br /> procedures,including the most recent versions of the test procedures listed above,may be used it Eauioment ManufacturerlModel Number <br /> determined by the Executive Officer or Executive Officer delegate.in writing,to yield comparable <br /> results. Testing the PressureNacuum(PN)Vent valve will be at the option of the local districts. If (Gas/E85) =Identifies that Nese components are approved for standard gasoline and E85 fuel blends. <br /> PN valve testing is required by the district,the test shall be conducted in accordance with <br /> TP-201.1E,Leak Rate and Cracking Pressure of PressurelVacuum Vent Valves <br /> (Gas)=Identifies that Nese components are only approved for standard gasoline fuel blends. <br /> (October 8,2007)and Exhibit 2. <br /> (E85)=Identifies that Nese components are only approved for E85 fuel blends. <br /> IT IS FURTHER ORDERED that the Phil-Tile system shall be compatible with gasoline m common <br /> use in Califomia at the time of certification,including E-85(85%elhano015%gasoline)for speck ' <br /> components listed in Exhibit 1. Any modifications to comply with future Califomia gasoline Spill Container Phil-Tice 85000 series(Gas/E85) <br /> requirements shall be approved in wri ing by the Executive Officer or Executive Officer delegate. Phil-Tite 85000-1 series(Gas/E85) <br /> IT IS FURTHER ORDERED that GDF installations permitted under VR-101-K for E-85 fuel that use 85000 and 85000-1 series legend: <br /> the PV-Zero-E85 PrNsureNacuum Vent Valve shall be subject to a throughput limitation of 1.2 85N9X-YYKZZZ (85000 series) <br /> million gallons per year(100,000 gallons per month). 85N9X-1YYY-ZZZ (85000-1 series) <br /> IT IS FURTHER ORDERED that the cenifcabon of the Phil-Tile Phase I Vapor Recovery System is W represented by: <br /> 0=preassembled spill container assembly <br /> valid through May 31,2012. 1=replacement spill container <br /> IT IS FURTHER ORDERED that Executive Order VR-101-K issued on June 30,2008,is hereby Xrepresented by: <br /> superseded by this Executive Order. Phil-Tice Phase I Vapor Recovery Systems certified under 0=product spill container <br /> Executive Orders VR-101-A to K may remain in use at existing installations. This Executive Order 1=vapor spill container <br /> shall apply to new installations or major modification of the Phase I system of existing gasoline <br /> dispensing facilities. _ L YYY represented by: <br /> S4 15=15-gallon capacity <br /> Executed at Sacramento,California,this day of September,2009 EXT=external for sump configuration(not available for <br /> 85000-1 series) <br /> NV=Vapor(replacement spill container) <br /> F=Product(replacement spill container) <br /> S=Stainless Steel(SS)Sleeve <br /> William V.-03C15fiod,Chief GS=Stainless Steel(SS)Sleeve and Gravel Shield <br /> Monitoring and Laboratory Div' <br /> ZZZ represented by: <br /> 15=15-galton capacity <br /> Attachments: EXT=external for sump configuration(not available for <br /> 85000-11senes) <br /> Exhibit 1 Phil-Tile Phase I Vapor Recovery System Equipment List NV=Vapor(replacement spill container) <br /> Exhibit 2Installation,Maintenance and Compliance Specifications F=Product(replacement spill container) <br /> Exhibit Manufacturing Performance Standards and Specifications S=Stainless Steel(SS)Sleeve <br /> GS=Stainless Steel(SS)Sleeve and Gravel Shield <br /> Spill Container Lid Phil-Tite 85011(Gas/E85)(nW required win sump configuraGm fid) <br /> Debris Bucket Phil-Tite PP-1005 TS(Gas/E85)(product)(not required) <br /> Phil-Tito PP-1005 TBP(Gas/E85)(vapor)(rat required) <br /> Executive Order VR-101-L,Phi6Tite Phase I Vapor Recovery System Page 3 Executive Order VR-101-L,Phil-Tile Phase I Vapor Recovery System,FxN81t 1, Page 1 <br />