Laserfiche WebLink
State of California requirements set forth in the Certification Procedures 201 and 205,and results in a vapor recovery <br /> AIR RESOURCES BOARD system which is at least 98.0 percent efficient as tested in accordance with test procedure TP-201.1, <br /> Volumetric Efficiency for Phase I Systems(October 8,2003); <br /> Executive Order VRA 01-L <br /> NOW,THEREFORE,IT IS HEREBY ORDERED that the Phil-Tito system is certified to be at least <br /> Franklin Fueling Systems,Inc. 98.0 percent efficient when installed and maintained as specified herein and in the following exhibits. <br /> Phil-Tile Phase I Vapor Recovery System Exhibit 1 contains a list of the certified components. Exhibit 2 contains the performance standards <br /> and specifications,typical installation drawings and maintenance intervals for the Phil-rite system as <br /> WHEREAS,the California Air Resources Board(ARB)has established,pursuant to Californiainstalled in a gasoline dispensing facility(GDF). Exhibit 3 contains the manufacturing specifications. <br /> Health and Safety Code sections 25290.1.2,39600,39601 and 41954,certification procedures for IT IS FURTHER ORDERED that compliance with the applicable certification requirements,rules and <br /> systems designed for the control of gasoline vapor emissions during the filling of underground regulations of the Division of Measurement Standards of the Department of Food and <br /> gasoline storage tanks,in its CP-201,Certification Procedure for Vapor Recovery Systems at P Agriculture, <br /> the Office State Fire Marshal of the Department of Forestry and Fire Protection,the Division of <br /> Gasoline Dispensing Facilities(Certification Procedure 201)as last amended May 25,2006, Occupational <br /> S Safety and Health of the Department of Intluslnal Relations,and the Division of Water <br /> incorporated by reference in title 17,California Code of Regulations,section 94011; quality of the State Water Resources Control Board are made conditions of this certification. <br /> WHEREAS,ARB has established,pursuant to California Health and Safety Code sections 39600, IT IS FURTHER ORDERED that Phil-Tito shall provide a warranty for the vapor recovery system <br /> 39601,and 41954,certification procedures for systems designed for the control of gasoline vapor and components to the initial purchaser. The warranty shall be passed on to each subsequent <br /> emissions at novel facilities in its CP-205,Certification Procedure for Vapor Recovery Systems purchaser within the warranty period. The manufacturer of components not manufactured by <br /> of Novel Facilities(Certification Procedure 205)as last amended March 17,1999,incorporated by Phil-Tice shall provide a warranty for each of their components certified herein. This warranty shall <br /> reference into title 17,California Code of Regulations,section 94015; include ongoing compliance with all applicable performance standards and specifications,and shall <br /> comply with all warranty requirements in section 16.5 of the Certification Procedure 201. Phil-rite or <br /> WHEREAS,ARB has established,pursuant to California Health and Safety Code sections 39600, other manufacturers may specify that the warranty is contingent upon the use of trained installers. <br /> 39601 and 41954,test procedures for determining the compliance of Phase I vapor recovery <br /> systems with emission standards; IT IS FURTHER ORDERED that the certified Phil-Tito system shall be installed,operated and <br /> maintained in accordance with the ARB-Approved Installation,Operation and Maintenance <br /> WHEREAS,Franklin Fueling Systems,Inc.(FFS)requested and was granted certification of the Manual for the PhiFTite Phase I Vapor Recovery System as certified by Executive Order <br /> Phil-Tile Phase I Vapor Recovery System(Phil-Tile system)pursuant to the Certification Procedure VR-101-L. A copy of this Executive Order and manual shall be maintained at each GDF where a <br /> 201 on June 19,2001 by Executive Order VR-101-A,and last modified on June 30,2008,by certified Phil-Tile system is installed. <br /> Executive Order VR-101-K; <br /> WHEREAS,FFS requested modifications to the certification to cerlity the FFS PV-Zero IT IS FURTHER ORDERED that equipment listed in Exhibit 1,unless exempted,shall be clearly <br /> identified by a permanent Identification showing the manufacturer's name and model number. <br /> Pressure/Vacuum Vent Valve for all gasoline blends,including 85%ElhanoVl5%gasoline fuel blend <br /> (E85); IT IS FURTHER ORDERED that any alteration in the equipment,parts,design,installation or <br /> WHEREAS,the requested modifications to the certification to certify components compatible with operation of the system certified hereby is prohibited and deemed inconsistent with this certification <br /> unless the alteration has been submitted in writing and approved in venting by the Executive Officer <br /> E85 on the Phil-Tile system have been evaluated pursuant to the Certification Procedure 205; or Executive Officer's delegate. l <br /> WHEREAS,Certification Procedures 201 and 205 provide that the ARB Executive Officer shall issue IT IS FURTHER ORDERED that the following requirements be made a condition of certification. <br /> an Executive Order if he or she determines that the vapor recovery system,including modifications, The owner or operator of the Phil-Tite system shall conduct,and pass,the following tests no later <br /> conforms to all of the applicable requirements set forth in the Certification Procedures; than 60 days after startup and at least once every three(3)years after startup testing,using the <br /> following test procedures: TP-201.3,Determination of2 Inch WC Static Pressure Performance <br /> WHEREAS,approve <br /> 2 delegatescation to the Chef of asthe Monitoring and Laboratory Division the authority of Vapor Recovery Systems of Dispensing Facilities(March 17,1999),TP-201.18,Static <br /> to certify or approve modifications);certified Phase I and Phase II vapor recovery systems for Torque of Rotatable Phase I Adaptors(October B,2003)and depending on me system <br /> gasoline dispensing facilities(GDF);and configuration,either TP-201.1 D,Leak Rate of Drop Tube Overfill Prevention Device and Spill <br /> WHEREAS,1,William V.Loscutoff,Chief of the Monitoring and Laboratory Division,find that the Container Drain Valve(October 8,2003);or TP-201.1C,Leak Rate of Drop Tubaeorain Valve <br /> Assembly(October 8,2003). Shorter time periods may be specified in accordance with local <br /> Phil-Tile Phase Vapor Recovery System,including modifications,conforms with all of the district requirements. Notification of testing,and submittal of test results,shall be done in <br /> Executive Order VR-101-L,Phil-Tine Phase I Vapor Recovery System Page 2 <br />