Laserfiche WebLink
Table 2-1 <br /> Double Fill Conflouration Gasoline Dispensing Facility Compliance Standards and Specifications <br /> A Phil-Tile Double Fill Configuration shall be allowed for installation provided that no more than two Component I System Test Method Standard or Specglcstion <br /> fill points are installed on any single underground storage tank and that no offset of the vapor <br /> recovery riser pipe is installed. An example of a Phil-Tito Double Fill configuration is shown in Minimum,360-degree rotation <br /> Figure 2D. Rotatable Phase I Adaptors TP-201.18 <br /> Maximum,108 pound-inch average static torque <br /> Sumo Configuration Overfill Preven0on Device TP-201.113 50.17 CFH at 2.00 inches H2O <br /> The Phil-Tile Sump Configuration is designed to place the spill containers inside of an underground Spill Container Drain Valve TP-201.1C or 50.17 CFH at 2.00 inches H2O <br /> sump with a single exterior lid as shown in Figure 2E. The Phil-Tite 85011 Cast Lids are not TP-201.113 <br /> required if spill containers are placed in a sump with a sump lid. Positive pressure setting: 2.5 to 6.0 inches H2O / <br /> Negative pressure selling: 6.0 to 100 inches H2O 1 <br /> Maintenance Records PIV Valve` TP-201.1E Positive Leakrale: 0.05 CFH at 2.0 inches H,,0 <br /> Each GOF operator or owner shall keep records of maintenance performed at the facility. Such Negative Leakrate: 0.21 CFH at A.0 inches H2O <br /> record shall be maintained on site or in accordance with district requirements or policies. Additional Vapor Recovery System TP-201.3 As specified in TP-201.3 and/or CP-201 <br /> information may be required in accordance with dishicl requirements or policies. The Connections and fittings Leak Detection <br /> records shall include the maintenance or test date,repair date to correct test failure,maintenance of certified without an allowable Solution or No leaks <br /> test performed,affiliation,telephone number,name and Certified Technician Number of individual leak rate bagging <br /> conducting maintenance or test. An example of a Phase I Maintenance Record is shown in <br /> Figure 2H. <br /> Table 2-2 <br /> Maintenance Intervals for System Components2 <br /> Manufacturer Component Mabnenanee <br /> Interval <br /> AU Models Dust Caps Annual <br /> All Models In Tank Gauge Port Probe Cap and Adaptor Kit Annual <br /> Drop Tube Overfill Prevention Device 708-49X-1 V series <br /> EBW DropTube Overfill Prevention Device 708-49X-3y series Annual <br /> EBW 782 Straight Drop Tube Annual <br /> Husky Pressure/Vacuum Vent Valve Annual <br /> FPS Pressure/Vacuum Vent Valve Annual <br /> OPW 61-T Straight Drop Tube Annual <br /> Phil-Tice Spill Container(all models) Every 3 years <br /> Phil-Tile Drop Tube Overfill Prevention Device 61SO-PT Annual <br /> Phil-Tice SWF-100-B Product Adaptor Annual <br /> SWF-100-SS Product Adaptor <br /> Phil-Tice SVVV-101-B Vapor Adaptor Annual <br /> SWV-101-SS Vapor Adafor <br /> ' Compliance dettereaton v5 at the option of the Marc, <br /> Maintenarxe must W conducted within the interval specified ban Ne data of Installa4m am at least whirm the speared interval <br /> thereafter. <br /> Execubve Order VR-101-L,FFS Phil-Tite Phase I Vapor Recovery System,Exhibit 2, Page 4 Executes Order VR-101-1_,Phil-Tile Phase I Vapor Recovery System,Exhibit 2, Page 5 <br />