My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
COMPLIANCE INFO 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:19:01 PM
Creation date
11/8/2018 9:55:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\3775\PR0231418\COMPLIANCE INFO\COMPLIANCE INFO 2012-2015.PDF
QuestysFileName
COMPLIANCE INFO 2012-2015
QuestysRecordDate
10/10/2017 8:57:48 PM
QuestysRecordID
3096410
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Page 4 of 9 <br /> 1. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Sump <br /> #87 Sump# 89 Sump# 91 Sump# <br /> Sump Diameter: 48" 48" 48" <br /> Sump Depth: 73" 72" 70" <br /> Sump Material&Manufacturer: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 12" 12" 14" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 29" 28" 29" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Fair Fair Fair <br /> Portion of Sum Tested' 2"Above highest 2"Above highest 2"Above highest 2"Above highest <br /> P penetration penetration penetration penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> product and water <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> shutdown? <br /> Was fail-safe verified to be <br /> operational?. ❑Yes❑No®NA ❑Yes E]No®NA ❑Yes ElNo®NA ❑Yes❑No®NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 1:07pm 1:OOpm 12:18p t <br /> Initial Reading(R]): 4.7018 1.3325 3.7575 <br /> Test End Time: 1:22pm 1:15pm 12:33pm <br /> Final Reading(RF): 4.7018 1.3327 3.7575 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-RI): 0 0.00017 0 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> ® Pass ❑Fail ® Pass ❑Fail <® Pa <br /> 7Was <br /> sensor removed for testing? ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> sensor properly replaced and ❑ ❑ ❑ ❑ ❑ ❑ ®Yes❑No❑NA <br /> fied functional after testing? ®Yes No NA ®Yes No NA ®Yes No NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.