Laserfiche WebLink
Page 5 of 9 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: See attached testing procedures. Equipment Resolution: <br /> UDC#1 /2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: <br /> UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 30" 30" 30" 30" <br /> Height from UDC Bottom to Top 8" 8" 8" 8" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 5" 5" 5" 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Fair Fair Fair Fair <br /> testing: <br /> Portion of UDC Tested Above highest Above highest Above highest Above highest <br /> penetration penetration penetration penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes [-]No®NA ❑Yes❑No®NA [:1 Yes [_1 No®NA [:1 Yes [-INo®NA <br /> product <br /> and water <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes ❑No ❑Yes No NA ❑Yes <br /> safe shutdown? ®NA ❑ ® El No®NA [I Yes El No®NA <br /> Was fail-safe verified to be <br /> erational? El Yes ElNo®NA ❑Yes ElNo®NA [_1 Yes ElNo®NA El Yes ElNo®NA <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 1:51 m 2:10 m 2:10 m 3:02 m <br /> Initial Reading(R,): 1.8285 1.8288 3.0516 2.9876 <br /> Test End Time: 2:06pm 2:25pin 2:25 m 3:17pm <br /> Final Reading(RF): 1.8288 1.8288 3.0514 2.9880 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-Ri): 0.00023 0 0.00017 0.00037 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Result: ® Pass ❑ Fail ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fall <br /> Was sensor removed for testing? ®Yes❑No ❑ NA ®Yes ❑No❑NA ®Yes ❑No ❑NA ®Yes ❑No❑NA <br /> Was sensor properly replaced and ❑ ❑ ❑ ❑ ® []No❑NA ®Yes❑No❑NA <br /> verified functional after testing? ®}es No NA ®Yes No NA Yes <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(•)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />