Laserfiche WebLink
U Page 9 of 9 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Spill Box#87 vapor Spill Box#89 vapor Spill Box#91 vapor Spill Box# <br /> Bucket Diameter&Brand: 12" 12" 12" <br /> Bucket Depth: 14" 14" 14" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> starting test: <br /> Test Start Time: 10:22am 10:22am 11:07am <br /> Initial Reading(R,): 2.6824 2.5721 2.6085 <br /> Test End Time: 10:37am 10:37am 11:22am <br /> Final Reading(RF): 2.6830 2.5722 2.6093 <br /> Test Duration: 15 minutes 15 minutes 15 minutes <br /> Change in Reading(RF-R,): 0.00055 0.00011 0.00079 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: <br /> ❑Fail ® Pass ❑ Fail ® Pass ❑Fail ❑ Pn'Er <br /> j Fain,-�+ <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />