Laserfiche WebLink
Page 8 of 9 <br /> 9. SPELL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Spill Box#87 fill Spill Box#89 fill Spill Box#91 till Spill Box# <br /> Bucket Diameter&Brand: 12" 12" 12" <br /> Bucket Depth: 12.5" 12.5" 12.5" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> starting test: <br /> Test Start Time: 10:02am 10:02am 10:46am <br /> Initial Reading(Rj): 4.3096 4.1703 3.9926 <br /> Test End Time: 10:17am 10:17am 11:81am <br /> Final Reading(RF): 4.3100 4.1704 3.9937 <br /> Test Duration: 15 minutes 15 minutes 15 minutes 15 minutes <br /> Change in Reading(RF-Ri): 0.00033 0.00008 0.00114 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: <br /> Test` 0sult: - Pass ❑ Fail ® ass ' ail 1 ® Pass ❑ Fail ❑ Pass ❑ Fafi <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />