My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1%NW %WW <br /> SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TK§TING <br /> Test Method Developed By: Sump Manufacturer ndustry Standard Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure Vacuum VHydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Sump# j Sump#2 d Sump# Sump it <br /> Sump Diameter: d ' 3 `e <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Top of r t <br /> Highest Piping Penetration: j <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 1 S ! <br /> Condition of sump prior to testing: ,r y <br /> Portion of Sump Tested' x ' 2A <br /> Does turbine shut down when // <br /> Yes No <br /> sump sensor detects liquid (both A Yes No ''NA Yes No NA Yes No NA <br /> product and water)?` <br /> Turbine shutdown response time R <br /> Is system programmed for fail-safe Yes No A Yes No .4NA Yes No NA Yes No NA <br /> shutdown?' <br /> Was fail-safe verified to be Yes F No A � ,(� <br /> operational?* Yes No ✓1VA Yes No NA -Yes No NA <br /> Wait time between applying <br /> pressure/vacuum/waterand starting <br /> test: <br /> Test Start Time: 1 1 30 1 <br /> Initial Reading(Ri): 9--2- 1 C r <br /> Test End Time: / Z d U 1130- <br /> Final Reading(RF): 12 < < 1 64 <br /> Test Duration: 6 m,.h 34) sM r✓+ <br /> Change in Reading(RF-Rs): <br /> Pass/Fail Threshold or Criteria: <br /> . e4 lts Pass 0 Fail /Pass 0 Fail 10 Pass ❑Fail ❑ Pass G gain <br /> Was sensor removed for testing? -. es No NA 11�es No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and es No NA Yes No NA Yes No NA Yes No " :NA <br /> verified functional after testing? <br /> Comments—(include in ormalion on re airs made prior to testing, and recommended allow-u or ailed tests <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA", the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.