My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer 4ndustry Standard Professional Engineer <br /> C)ther(Spec) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used. Equipment Resolution: <br /> Piping Run# f W.1-1- Piping Run #ht Sp;,r' Piping Run #1 Piping Run 0 <br /> Piping Material: <br /> Piping Manufacturer: 1 C u <br /> Piping Diameter: 3 + r a r t <br /> Length of Piping Run; Lj(y ` Lf Q t-{ L <br /> Product Stored: p I C t n,e <br /> Method and location of bo r/Aj A/ -V- ' �� suA, <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and l a A"i f 13 '"J4 /U r+i,�► <br /> starting test: <br /> Test Start Time: 1104 1100 1/410 <br /> Initial Reading(R,): 5 f's S p5.17 s— 1'S� <br /> Test End Time: [ Zoo t 20a <br /> Final Reading(RF): <br /> Test Duration: l A � <br /> Change in Reading(RF-R,): <br /> Pass/Fad Threshold or <br /> Criteria: <br /> Test Result: Pass C; )trail Pass 0 Fail Pass �FgiE. C7 ❑It fl. <br /> Comments—(include information on repairs made prior to testing, and recommended follow-uP or failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.