My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE:Do not attempt unauthorized repairs. <br /> on inters nal~ 3.6. PRESSURIZING THE INTERSTITIAL SPACE <br /> test manifold IN A DRY TANK <br /> �air-supply valve <br /> air-pressure gauge air-pressure gauge 0 WARNING <br /> pressun-relief Never lift or hoist a tank under pressure.Failure to follow <br /> device this warning could result in death or serious injury. <br /> FIGURE 3-2 NOTE:Do not attempt unauthorized repairs. <br /> NOTE:All compartments on a double-wall tank may be man- 3.6.1.Tanks with a dry interstitial space not shipped under vac- <br /> ifolded together and tested simultaneously,or each com- uum come with a quick-disconnect assembly.See FIGURE 3-3. <br /> partment may be tested separately. <br /> 3.4.3.2.A test manifold is needed for testing the dry interstitial - — <br /> space of an air-testable,double-wall tank.See FIGURE 3-2. Nylon tie <br /> NOTE:A test manifold is not required for a tank with an in- j <br /> terstice filled with monitoring fluid. -' <br /> 3.4.4.During air tests,ambient air temperature can affect <br /> pressure-gauge readings. Monitoring access Quick-disconnect <br /> fitting assembly <br /> Q CAUTION II <br /> Allow for pressure variations when tanks are subject to <br /> abrupt temperature changes.Failure to follow this caution <br /> may result in minor or moderate injury. <br /> FIGURE 3-3 <br /> 3.4.5.When testing tanks with wet monitoring,remove the 3.6.2.If the tank is not configured as shown in FIGURE 3-3 <br /> reservoir-fitting plug. prior to preinstallation testing,contact the plant from which <br /> 3.4.6.If the tank has threaded fittings,it Is the installer's re- the tank was shipped. <br /> sponsibility to select a thread sealant that is compatible with 3.6.3.The quick-disconnect assembly must not be connected <br /> the product being stored.Some sealants cannot be used with to the service fitting when air testing the primary tank.Keep <br /> some stored products. the nylon tie in place. <br /> 3.4.7.Install permanent plugs in all openings where piping will 3.6.4. Maintain the pressure in the primary tank. <br /> not be installed. <br /> 3.4.8.Make sure all manway bolts are tightened,and fitting CAUTION <br /> plugs are property doped and sealed. Do not connect the air supply directly to the interstitial- <br /> space monitoring access fitting.Pressurizing the secondary <br /> 3.4.8.1.The tank may be air tested with the factory-supplied tank(interstitial space)by itself may damage the primary <br /> temporary plugs.Redope and tighten temporary plugs if tank or cause tank failure. <br /> needed. 3.6.5.Free the hose from the service fitting by cutting the <br /> 3.4.9.Keep one service fitting open in each compartment for nylon tie. <br /> the test manifold. 3.6.6.Insert the hose into the quick-disconnect fitting.This will <br /> 3.4.10.Tanks equipped with flanged nozzles may require con- allow air to transfer from the primary tank to the interstitial space. <br /> tractor-supplied blind flanges for preinstallation air testing. 3.6.7. Reconnect the air-supply line.Allow the pressure to sta- <br /> 3.5. PRESSURIZING THE PRIMARY TANK bilize at 5 psig(3 psig for 12-foot-diameter tanks)by adding or <br /> 3.5.1.Install the test manifold in the open service fitting and con- removing air as necessary. <br /> nect the pressure source to the test manifold.See FIGURE 3-3. 3.6.8.Close the air-supply valve on the test manifold and dis- <br /> 3.5.2.If the interstitial space is dry, install the test manifold connect the air-supply line. <br /> and close the valve before pressurizing the primary tank. 3.7. SOAPING THE TANK <br /> 3.53.Open the air-supply valve and pressurize the primary tank 3.7.1.After pressurizing the tank,soap the tank to check the <br /> to 5 psig(3 psig for 12-foot-diameter tanks).Allow a few min- tank's integrity. <br /> utes for the air temperature in the tank to stabilize,then allow 3.7.1.1.Soap either the fittings,manways and covers or the <br /> the pressure to stabilize by adding or removing air as necessary. entire exterior of the tank,depending on what part of the test- <br /> 3.5.4.Hold and monitor the pressure for a minimum of 1 hour. ing process the tester is at and what kind of tank is being air <br /> tested.See SECTION 4 instructions for specific types of tanks. <br /> 3.5.4.1.If the test manifold shows a pressure build-up in the <br /> interstitial space of a dry-monitor,double-wall tank,contact 3.7.1.2.Watch for active air bubbles.There should not be any. <br /> the plant from which the tank was shipped. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.