Laserfiche WebLink
NOTE:Do not attempt unauthorized repairs. <br /> on inters nal~ 3.6. PRESSURIZING THE INTERSTITIAL SPACE <br /> test manifold IN A DRY TANK <br /> �air-supply valve <br /> air-pressure gauge air-pressure gauge 0 WARNING <br /> pressun-relief Never lift or hoist a tank under pressure.Failure to follow <br /> device this warning could result in death or serious injury. <br /> FIGURE 3-2 NOTE:Do not attempt unauthorized repairs. <br /> NOTE:All compartments on a double-wall tank may be man- 3.6.1.Tanks with a dry interstitial space not shipped under vac- <br /> ifolded together and tested simultaneously,or each com- uum come with a quick-disconnect assembly.See FIGURE 3-3. <br /> partment may be tested separately. <br /> 3.4.3.2.A test manifold is needed for testing the dry interstitial - — <br /> space of an air-testable,double-wall tank.See FIGURE 3-2. Nylon tie <br /> NOTE:A test manifold is not required for a tank with an in- j <br /> terstice filled with monitoring fluid. -' <br /> 3.4.4.During air tests,ambient air temperature can affect <br /> pressure-gauge readings. Monitoring access Quick-disconnect <br /> fitting assembly <br /> Q CAUTION II <br /> Allow for pressure variations when tanks are subject to <br /> abrupt temperature changes.Failure to follow this caution <br /> may result in minor or moderate injury. <br /> FIGURE 3-3 <br /> 3.4.5.When testing tanks with wet monitoring,remove the 3.6.2.If the tank is not configured as shown in FIGURE 3-3 <br /> reservoir-fitting plug. prior to preinstallation testing,contact the plant from which <br /> 3.4.6.If the tank has threaded fittings,it Is the installer's re- the tank was shipped. <br /> sponsibility to select a thread sealant that is compatible with 3.6.3.The quick-disconnect assembly must not be connected <br /> the product being stored.Some sealants cannot be used with to the service fitting when air testing the primary tank.Keep <br /> some stored products. the nylon tie in place. <br /> 3.4.7.Install permanent plugs in all openings where piping will 3.6.4. Maintain the pressure in the primary tank. <br /> not be installed. <br /> 3.4.8.Make sure all manway bolts are tightened,and fitting CAUTION <br /> plugs are property doped and sealed. Do not connect the air supply directly to the interstitial- <br /> space monitoring access fitting.Pressurizing the secondary <br /> 3.4.8.1.The tank may be air tested with the factory-supplied tank(interstitial space)by itself may damage the primary <br /> temporary plugs.Redope and tighten temporary plugs if tank or cause tank failure. <br /> needed. 3.6.5.Free the hose from the service fitting by cutting the <br /> 3.4.9.Keep one service fitting open in each compartment for nylon tie. <br /> the test manifold. 3.6.6.Insert the hose into the quick-disconnect fitting.This will <br /> 3.4.10.Tanks equipped with flanged nozzles may require con- allow air to transfer from the primary tank to the interstitial space. <br /> tractor-supplied blind flanges for preinstallation air testing. 3.6.7. Reconnect the air-supply line.Allow the pressure to sta- <br /> 3.5. PRESSURIZING THE PRIMARY TANK bilize at 5 psig(3 psig for 12-foot-diameter tanks)by adding or <br /> 3.5.1.Install the test manifold in the open service fitting and con- removing air as necessary. <br /> nect the pressure source to the test manifold.See FIGURE 3-3. 3.6.8.Close the air-supply valve on the test manifold and dis- <br /> 3.5.2.If the interstitial space is dry, install the test manifold connect the air-supply line. <br /> and close the valve before pressurizing the primary tank. 3.7. SOAPING THE TANK <br /> 3.53.Open the air-supply valve and pressurize the primary tank 3.7.1.After pressurizing the tank,soap the tank to check the <br /> to 5 psig(3 psig for 12-foot-diameter tanks).Allow a few min- tank's integrity. <br /> utes for the air temperature in the tank to stabilize,then allow 3.7.1.1.Soap either the fittings,manways and covers or the <br /> the pressure to stabilize by adding or removing air as necessary. entire exterior of the tank,depending on what part of the test- <br /> 3.5.4.Hold and monitor the pressure for a minimum of 1 hour. ing process the tester is at and what kind of tank is being air <br /> tested.See SECTION 4 instructions for specific types of tanks. <br /> 3.5.4.1.If the test manifold shows a pressure build-up in the <br /> interstitial space of a dry-monitor,double-wall tank,contact 3.7.1.2.Watch for active air bubbles.There should not be any. <br /> the plant from which the tank was shipped. <br /> 5 <br />