My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE:During freezing conditions,a suitable solution such CAUTION <br /> as windshield washer fluid may be added to the soap and <br /> water mixture. Never allow the pressure in the Interstitial space to be <br /> greater than the pressure in a primary tank.Failure to follow <br /> 3.7.2.When doing a soap test,rotate the tank to check the this caution may result in damage to a primary tank and/or <br /> bottom.Do not rotate a tank filled with monitoring fluid. tank failure. <br /> 3.7.2.1.Before rotating the tank,place protective material on I0 WARNING <br /> the area on which the tank will be rotated.Make sure the area Never remove the service-fitting plugs when there is pres- <br /> is flat and free of large or sharp objects,such as rocks,which sure in the tank.Failure to follow this warning could result in <br /> may damage the tank. death or serious injury. <br /> 3.7.2.2.Rotate the tank slowly and carefully to avoid develop- 3.9.4.Remove the test manifolds and replace the protective <br /> ing too much momentum.Momentum can grow because covers in the service fittings. <br /> manways and fittings on top of the tank make it top heavy. <br /> Make sure the tank's fittings and manways never touch the 4. PREINSTALLATION TESTING FOR <br /> ground.Do not rotate the tank more than 120 degrees from SPECIFIC TYPES OF AIR-TESTABLE TANKS <br /> the initial starting point. <br /> NOTE:When air testing a tank,follow the procedures out- <br /> 3.7.3. If damage is detected,contact the plant from which the lined here for the specific type of tank being installed.For <br /> tank was shipped. more specific details on these procedures,see the SECTION <br /> NOTE:Do not attempt unauthorized repairs. 3 SECTIONS and SUBSECTIONS to which you are referred. <br /> 3.8. PERFORMING VISUAL CHECKS ON A TANK 4.1. AIR TESTING A SINGLE-WALL TANK <br /> WITH A WET INTERSTITIAL SPACE 4.1.1.Prepare the tank for air testing.See SECTION 3.4. <br /> CAUTION 4.1.2.Pressurize the tank.See SECTION 3.5. <br /> Never pressurize a wet interstitial space.Doing so may 4.1.3.Soap the entire exterior of the tank.See SECTION 3.7. <br /> damage the primary tank or cause tank failure. 4.1.4.Hold and monitor the pressure for a minimum of 1 hour. <br /> CAUTION 4.1.5.Carefully release the air pressure from the tank.See <br /> Never rotate a tank filled with monitoring fluid.Doing so SECTION 3.9. <br /> may result in damage to the tank and/or tank failure. 4.1.6.Remove the test manifold and replace the protective <br /> 3.8.1.Check that the tank has monitoring fluid in the reservoir. covers in the service fittings. <br /> Measure the level of the monitoring fluid in the reservoir. 4.2. TESTING A WET DOUBLE-WALL TANK <br /> NOTE:If the reservoir is less than a third full,contact the <br /> plant from which the tank was shipped.See the back cover CAUTION <br /> of the Installation Manual for contact numbers. Never pressurize a wet interstitial space.Doing so may re- <br /> 3.8.2.Usually check the interior of the tank for monitoring sult in damage to the primary tank and/or tank failure. <br /> fluid.There should not be any. 4.2.1.Check the level of the monitoring fluid In the reservoir. <br /> See SECTION 3.8.for instructions. <br /> 3.8.2.1.When checking a multicompartment tank,inspect the <br /> interior of each compartment for monitoring fluid. 4.2.2.Visually check the interior and the exterior of each com- <br /> partment3.8.3.Usually check the exterior of the tank for monitoring for the presence of monitoring fluid.See SECTION <br /> 3.8.for instructions. <br /> fluid.(The monitoring fluid is dyed blue to distinguish between <br /> moisture and monitoring fluid.)If monitoring fluid is found,wipe 42.3.If the monitoring fluid is not at the proper level,and/or moni- <br /> the tank dry and verity that the monitoring fluid does not reap- toring fluid is found on either the interior or the exterior of any <br /> pear.Lift the tank to check the bottom. Do not roll the tank. compartment,contact the plant from which the tank was shipped. <br /> 3.6.3.1.When checking a multicompartment tank,inspect the 4.2.4.If there is no monitoring fluid on either the interior or the <br /> exterior of each compartment for monitoring fluid. exterior of any compartment,proceed to backfill the tank to <br /> 3.9. RELEASING PRESSURE FROM THE TANK the top of the tank. <br /> 3.9.1.If there is an interstitial space to pressurize,open the 42.5.After the tank is backfilled to the top of the tank,it must <br /> valve of the test manifold and carefully release the air pressure be air tested.See SECTION 13 for instructions. <br /> in the interstitial space first. 4.3.TESTINGADRYWONROR, DOUBLE-WALLTANK <br /> 3.9.2.If the tank is a multicompartment tank,carefully release WRH THE INTERSTTTIAL SPACE UNDER VACUUM <br /> the air pressure in the end compartments first. 4.3.1.A dry-monitor,double-wall tank may be shipped from <br /> the factory with the interstitial space under vacuum.This op- <br /> 3.9.3.Then carefully release the air pressure from the base tank. tion allows for monitoring the tank during shipping and han- <br /> dling,and may expedite tank installation by shortening <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.