Laserfiche WebLink
system(f used)and geotextile fabric(if used).See SECTIONS <br /> Air-test Monitoring of Secondary Tank 7,2., 7.3.and 7.4. <br /> (dry irMrstiLal space) <br /> •• •• 5.2.4.2.When preparing the excavation,allow for the appropri- <br /> ate depth of cover as specified in SECTION 7.4. <br /> 5.2.4.3. If two or more tanks are to be installed in the same ex- <br /> cavation hole,follow instructions in SECTION 7.5. <br /> FIGURE 4-4 5.2.4.4.If the tank has a bottom sump or fitting,prepare the <br /> 4.5.7.Soap the entire exterior of the tank.See SECTION 3.7. excavation hole according to instructions in SECTION 10. <br /> 4.5.8.Hold and monitor the pressure for a minimum of 1 hour. 5.2.5. Remove all loose material from the excavation. <br /> 4.5.9.Carefully release the air pressure from the tank.See 5.2.6.Where necessary,level the bottom of the excavation <br /> SECTION 3.9. using primary backfill material,filling in any low areas.See <br /> 4.5.10.Remove the test manifolds and replace the protective SECTION 6 for backfill requirements. <br /> covers in the service fittings. 5.2.7.If an anchor slab is needed,install it now.See POINT <br /> 7.5.3.3.and SECTION 8.6. <br /> 5. INSTALLING TANKS 5.2.8. If geotextile fabric is to be used,place it in the excava- <br /> Q WARNING tion hole at this time.See SECTION 9. <br /> 5.2.8.1.Geotextile must be placed to separate the primary <br /> dling.Safeguard against sparkss,,fire <br /> If product is used as ballast,exercise freor product spills.Im- <br /> special care in ham- backfill material from all other in situ soil and/or secondary <br /> proper handling of product could cause a fire or explosion backfill material. <br /> and could result in death or serious injury. 5.2.9.If deadmen are used,see SECTION 8 for information on <br /> 0 WARNING deadmen placement and place them now. <br /> Do not use air pressure to test tanks that contain or have 5.2.9.1.If deadmen are used and they are to be placed so that <br /> contained flammable or combustible liquids or vapors.The they are in the bedding or below the bottom of the tank, place <br /> fuel and air mixture could explode and could result in death the deadmen before preparing the backfill bedding. <br /> or serious injury.Tanks should be air tested before ballast- <br /> ing.See SECTION 12. 5.2.10.Prepare a 12-inch-thick smooth,level bed of approved <br /> primary backfill material on the bottom of the excavation.See <br /> CAUTION SECTION 6 for backfill requirements. <br /> Adequately ballast the tank(add liquid)in a wet hole or in a <br /> dry hole that may become wet(for example,from site runoff) CAUTION <br /> until the installation is totally completed.Failure to do this If anchor straps are used,bedding must be carefully leveled. <br /> may result in damage to the tank and/or surrounding property. Failure to follow this caution may result in straps being too <br /> 5.1. GENERAL short or too long,and may result in property damage. <br /> 5.1.1.Take safety precautions throughout the entire installation 5.2.10.1.If the excavation has soft soil conditions or if there <br /> process.See SECTIONS 1.1.and 7.1. might be difficulties controlling water accumulation,it is ac- <br /> ceptable to increase the bedding thickness to 18 inches and <br /> 5.1.2.Use only approved backfill material.See SECTION 6. set the tank anchors 6 inches off the bottom of the excavation <br /> 5.1.3.Do not mix approved material together with sand or in (9 inches for 10-foot-diameter tank deadmen). <br /> situ soil. 5.2.11.See SECTION 2 regarding the use of lifting lugs to <br /> 5.1.4.Do not use in situ soil as primary backfill material. hoist the tank when unloading and installing it. <br /> 5.1.5.Typically,all excavated in situ soil must be replaced with 5.2.12.Place the tank or tanks onto the bed. <br /> primary backfill material. 5.2.12.1.ff deadmen are in place,center the tanks between them. <br /> 5.2. DRY-HOLE INSTALLATION CAUTION <br /> 5.2.1.Before beginning tank installation,take a tank diameter <br /> measurement.See SECTION 11 for instructions. Do not set tanks directly onto a concrete slab,timbers, <br /> cradles or in situ soil.Failure to follow this caution may <br /> 5.2.2.Record this measurement as Measurement#1 on the resutt in damage to the tank. <br /> Tank Installation Checklist. 5.2.12.2.Align the tanks with anchors for proper placement of <br /> 5.2.3.Locate the excavation site according to instructions in anchor straps. <br /> SECTIONS 7.1.and 7.2. 5.2.12.3.As the tank is being placed,slope the tank according <br /> 5.2.4.Prepare the excavation according to instructions in to site specifications. <br /> SECTION 7. NOTE:Xeres does not require that a tank be sloped.The <br /> 5.2.4.1.When preparing the excavation,allow for an anchoring slope is determined by the tank owner's specifications. <br /> 8 <br />