Laserfiche WebLink
preinstallation testing procedures.The date that the vacuum 4.4.8.Carefully release the air pressure from the tank.See <br /> was applied Is on a label by the monitor or on the shipping SECTION 3.9. <br /> documentation delivered with the tank. 4.4.9.Remove the test manifold and replace the protective <br /> 4.3.1.1.This date may be used as a reference under this pro- covers in the service fittings. <br /> cedure to evaluate the tank's integrity prior to installation,and 4.5.AIR TESTING A DRY MONffOR, DOUBLE-WALL <br /> to validate Xerxes'obligations under the limited warranty. MULTICOMPARTMENT TANK NOT UNDER VACUUM <br /> 4.3.1.2.Xeres tanks shipped under vacuum must be under <br /> vacuum for a minimum of 7 days.If this requirement is not met, CAUTION <br /> an air/soap test is required.See SECTION 4 for instructions. Do not connect air supply directly to the interstitial-space <br /> 4.3.1.3.The tank shipped under vacuum should be Installed monitoring access fitting.Pressurizing the interstitial space <br /> by itself may result in damage to the primary tank and/or <br /> and backfilled with the vacuum intact if both of the following tank failure. <br /> two conditions are met: <br /> 4.5.1. Prepare the tank for air testing.See SECTION 3.4. <br /> 4.3.1.3.1.installation of the tank is to begin 7 days or more <br /> after the factory application of vacuum(as indicated on the 45.1.1.Install a test manifold in each compartment,that Is,in <br /> shipping documents and/or tank labels) the base tank and each and compartment.See FIGURE 4-1. <br /> 4.3.1.3.2.the vacuum gauge shipped with the tank reads 12 <br /> inches of mercury or more. opfimrst maervoir rtamay IL^9 Typical Monitoring access <br /> NOTE:The vacuum-monitoring method is less sensitive and (wet kmenatiod space) with finings semce filkn9 fitting � ) <br /> l <br /> less reliable than the soap test described in SECTION 3.7. Pressure- / �� <br /> Under certain field conditions(such as major changes in relief veva <br /> 4;;, <br /> for shipgng <br /> temperature,barometric pressure and/or altitude)and/or E„o <br /> with certain equipment failure(such as freezing or sticking corpamnerd <br /> of gauge mechanism),the vacuum-monitoring method may <br /> not be an accurate enough test.When in doubt,or when ! \ -Flat <br /> such conditions occur,Xeres recommends SECTION 4.4.or ! Seam for base tank `. `tib <br /> 4.5.(whichever is applicable)as the preferred preinstallation Seam for end compartment Seam for and compartment <br /> test procedure. <br /> 4.3.1.4.After the tank is backfilled to the top of the tank,the FIGURE 4-1 <br /> tank must be air tested.See SECTION 13 for instructions. 4.5.2.Pressurize the primary tank.See SECTION 3.5 and <br /> FIGURE 4-2. <br /> 4.3.1.5.If either or both of the conditions stated in POINTS <br /> 4.3.1.3.1.and 4.3.1.3.2. are not met,follow the procedures of <br /> SECTION 4.4.or 4.5. (whichever is applicable)for the prein- Air Test of Base Tank <br /> stallation test. e e ef. elle <br /> 4.3.1.5.1.If the gauge reads less than 12 inches of mercury, <br /> perform a visual inspection of the exterior of the tank and the <br /> vacuum gauge fittings to evaluate the tank's integrity,and <br /> contact the plant from which the tank was shipped. <br /> FIGURE 4-2 <br /> NOTE:Do not attempt unauthorized repairs. <br /> 4.5.3. Pressurize the end compartment(s).See SECTION 3.5. <br /> 4.3.1.6.Record the vacuum gauge reading at the time of in- and FIGURE 4-3. <br /> stallation on the Tank Installation Checklist. <br /> 4.4.ARTMMADl?R" MR,DOIK.EWALLTAW Air Test of EndCompartment(s) <br /> 4.4.1.Prepare the tank for air testing.See SECTION 3.4. ie e e <br /> 4.4.2.Pressurize the primary tank.See SECTION 3.5. <br /> 4.4.3.Soap all service finings and manways.See SECTION 3.7. <br /> 4.4.4.Hold and monitor the pressure in the primary tank for a <br /> minimum of 1 hour. <br /> FIGURE 4-3 <br /> 4.4.5.Use the quick disconnect assembly to pressurize the in- 4.5.4.Soap all service fittings,manways and covers.See <br /> terstitial space.See SECTION 3.6. SECTION 3.7. <br /> 4.4.6.Soap the entire exterior of the tank.See SECTION 3.7. 4.5.5.Hold and monitor the pressure for a minimum of 1 hour. <br /> 4.4.7.Hold and monitor the pressure in the interstitial space 4.5.6.Use the quick-disconnect assembly to pressurize the in- <br /> for a minimum of 1 hour. terstitlal space.See SECTION 3.6.and FIGURE 4-4. <br /> 7 <br />