My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX C: XERXES SPLIT BACKFILL INSTRUCTIONS <br /> Cf.GENERAL C2.5.Secondary backfill must be compacted to achieve a mini- <br /> C1.1.Use select rounded or crushed stones for primary backfill mum of 85 percent standard proctor density. <br /> material as specified in the Xerxes Installation Manual in effect at C2.5.1.Do not use rammer-type compactors over the top of the <br /> time of installation,and the Xerxes APPENDIX B(and supplement), tank. <br /> Primary Backfill Requirements. <br /> C2.5.2.Some tank owners may require sample testing and written <br /> C2.SPLIT BACKRLL INSTALLATION reports to verify the compaction of the backfill. <br /> C2.1.Use the primary backfill material vertically up to at least 75 C2.6.Material must be installed in 12-inch to 24-inch lifts compat- <br /> percent of the tank diameter.See FIGURE Cl-1. ible with the compaction equipment used. <br /> C2.2.Follow the instructions in SECTION 6 of the Installation C2.7.In some conditions,frost heave may be encountered when <br /> Manual on the placement of this backfill material. using secondary backfill.Therefore,consider any problems that <br /> C2.3.Install a layer of geotextile fitter fabric over the entire surface may occur. <br /> of the primary backfill material.See SECTION 9 for more informs- C2.8.Specifications for secondary backfill material and com- <br /> tion about geotextile fitter fabric. paction above the filter fabric layer may be determined by the re- <br /> C2.3.1.All joints in the fitter fabric should be ovedapped a mini- quirements of the piping,surface slab or roadway. <br /> mum of 12 inches. C2.9.Refer to applicable codes or standards for base course and <br /> C2.3.2.Geotextile fabric must overlap onto the tank and excava- subbase course material and compaction requirements. <br /> tion surface a minimum of 12 inches. C2.10.The following are examples of acceptable secondary back- <br /> C2.3.3.Installations with unstable soil may require that the fabric fill material: <br /> line the entire excavation.See SECTION 9 for specific information C2.10.1.clean native backfill <br /> about using geotextile filter fabric in unstable-soil conditions. C2.10.2.coarse send or gravel <br /> C2.4.Clean native backfill may be used as secondary backfill ma- C2.11.One hundred percent(100%)of all backfill material must <br /> terial above the geotextile fabric to subgrade. <br /> pass through a 1-inch sieve. <br /> C2.4.1.Secondary backfill material must be clean,free-flowing, <br /> and free of large rocks,roots,organic materials,debris,ice and <br /> snow.Backfill material shall not be frozen or contain lumps of <br /> frozen material at any time during installation. <br /> FIGURE G1-1 —Split Backfill Installation <br /> Grade or subgrade <br /> Secondary backfill Y <br /> material III <br /> IIII IIII <br /> Filter fabric with a III <br /> minimum of 12" overlaps IIII III <br /> IIII -III <br /> IIII ith <br /> IIII =III <br /> IIII= IIII <br /> IIII (-III 75% of tank diameter <br /> Primary backfill IIII y -IIII <br /> 11 =III <br /> material IIII= = 12" bedding <br /> Jill=Jill=Jill = Jill = Jill- IIII-IIII - III <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.