My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XEMS TANK INSTALLATION CHECKLIST <br /> The tank owner should retain a copy of the completed Tank Installation Checklist in order to facilitate any warranty claim.Unless other <br /> information is requested,initial each step to verity that the item has been performed or installed per Installation Manual specifications <br /> and instructions. <br /> Al.GENERAL INFORMATION <br /> Date of Installation <br /> Address of Installation <br /> Tank Owner Name Telephone Email <br /> Address <br /> Contractor Name Telephone Email <br /> Address <br /> A2.TANK INFORMATION <br /> Tank Number Tank#1 Tank#2 Tank#3 Tank#4 <br /> UL#(from tank label) <br /> Nominal Tank Diameter(in feet)& <br /> Capacity(in gallons) <br /> Tank Type(SW,DW,MC,OWS, <br /> Other,and Wet or Dry) <br /> A3.PREINSTALLATION (See SECTIONS 2 and 3 for instructions and specifications.) <br /> Visual Inspection(no damage) <br /> Tanks shipped under vacuum <br /> (SECTION 4.3.requirements met) <br /> Tanks with monitaing fluid <br /> (record fluid level in reservoir and check <br /> for absence of fluid in a on tank) <br /> Tank passed pmwurelsoap test if req'd <br /> A4.DIAMETER MEASUREMENTS(See SECTION 11 for instructions and requirements.Mark location of measurements on site sketch.) <br /> Measurement#1 (before installation) <br /> Measurement#2(straps installed) <br /> Measurement#3 fbackfilled to top oftaNQ <br /> Measurement#4 backfilled to subgrade) <br /> Deflection measurement(#1—#4) <br /> Measuiumer meats regU of TABLE 11-1 <br /> A5.INSTALLATION(See SECTIONS 5,6,7,8,9, 12 and 14 for instructions and specifications.) <br /> Primary backfill material <br /> Secondary backfill material(it used) <br /> Traffic loads(indicate yes or no) <br /> Excavation(size and condition) <br /> Hole condition(indicate dry or wet) <br /> Backfill bedding <br /> Tank spacing(between tanks and <br /> from excavation walls) <br /> Anchoring(indicate system used: <br /> none,deadmen or anchor slab) <br /> Anchoring(if used) <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.