My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B) Gluing F-Series Electrical to Sump Wall <br /> 13.1) For F-1X-RR fitting models and your PVC-Coated ROBROYTm Brand Conduit, or your F-1X- <br /> SS fitting models and galvanized Condit should be clean and COMPLETELY DRY AT ALL TIMES. <br /> All pre-abraded or milled areas should be inspected for debris and inconsistencies. No dirt, grit, <br /> water or other foreign material should be on or inside the fiberglass fitting components. <br /> USE SMITH TM ADHESIVE # 7069 or 8069 <br /> or AMERONTM PSX-20 8oz ONLY <br /> 6.2) Get one clamping tool ready for each fitting installation. <br /> 6.3) Follow your adhesive ` <br /> manufacturer Instructions to mix and <br /> Adhesive <br /> apply your adhesive. One bag of provided Fig. 134 <br /> fiberglass filler is to be fully mixed with each <br /> adhesive kit. (Pg. 3) <br /> DO NOT ATTEMPT TO MIX MORE <br /> THAN ONE KIT AT A TIME. <br /> 13.4) Main body first - carefully apply a <br /> generous amount of adhesive to the wall and <br /> the face that will meet the wall (Fig. 134). <br /> ACAUTION <br /> DO NOT ALLOW ADHESIVE TO <br /> FILL THE CHANNEL OR TEST <br /> PORT AREA <br /> OUTSIDE <br /> ONLY <br /> � <br /> ONLY <br /> Carefully apply mixed <br /> adhesive to the flange <br /> 6 ii-F-Series-1 X-SS-D-11 A <br />
The URL can be used to link to this page
Your browser does not support the video tag.