My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B.5) The main fitting body (Item A) should be installed to Interstitial Test Port <br /> the outside first. Then apply adhesive as shown (Fig. 65). (Only on Flange) <br /> 0 K1, + Adhesive <br /> 1 � � Injection <br /> The Adhesive Injection Port on the fitting body Port <br /> must be at the 12-o-Clock or North Position. I f <br /> i <br /> The Interstitial Test Port on the Flange <br /> must be at 12-o-Clock or North Position. (Fig.' X) <br /> Fig. 135 Fig. B8 <br /> Adhesive Fill <br /> Bead <br /> Here <br /> 360° <br /> Item B <br /> Item A (Flange) <br /> (Main body) <br /> / <br /> Adhesiver// I <br /> OUTSIDE / <br /> Install Main body to outside of sump Install the loose Flange <br /> and apply adhesive to areas shown and use gloved finger to run a <br /> generous bead along joint. <br /> 6.6) Apply adhesive to the Main Body's outer surface 3600 where shown. Fig. B7 <br /> After applying adhesive to all contact areas (Fig. 65)Apply the flange over <br /> the fitting and to the wall (Item B, Fig. B.5) <br /> 6.7) Apply the Bravo Clamp immediately as shown in Fig. B7. Install clamp <br /> shown to the body roughly 1/4"from the face and tighten.Then hand-tighten <br /> each bolt so it is snug.Apply a 1/4- 1/2 tum to each bolt evenly until the <br /> clamp starts to slide away from the wall and flush with the face of the fitting. CLAMP <br /> 6.8) Apply a generous bead of adhesive as shown. (Fig. 138). INSIDE <br /> B.9) Glue all penetration fittings and allow to cure following the <br /> pipe manufacturers adhesive instructions. <br /> 7 ii-F-Series-lX-SS-D-11A <br />
The URL can be used to link to this page
Your browser does not support the video tag.