Laserfiche WebLink
SWRCB,January 2002 Page 4 of S <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: U Piping Manufacturer U Industry Standard Li Professional Engineer <br /> U Other(Speck) <br /> Test Method Used: U Pressure U Vacuum U Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> i n -mn isolation: <br /> Wait time between applying <br /> pressure/vacuun-/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(R,): <br /> Test Duration: <br /> Change in Reading(RR,): <br /> PasstFail Threshold or <br /> Criteria: <br /> Test Result: U Pass U Fall U Pass U Fall U Pass U Fall U Pass U Fall <br /> Comments—(include information on repairs made prtorro taking, and recommended follow-up forfailed tests) <br />