My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO 1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:50:15 PM
Creation date
11/8/2018 9:58:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\V\VICTOR\930\PR0502817\COMPLIANCE INFO\COMPLIANCE INFO 1985-2006.PDF
QuestysFileName
COMPLIANCE INFO 1985-2006
QuestysRecordDate
5/19/2016 8:14:18 PM
QuestysRecordID
3086574
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page-!-of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: U Piping Manufacturer XI Industry Standard U Professional Engineer <br /> U Other(Spec) <br /> Test Method Used: LXPressure U Vacuum U Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: Pressure Gages Equipment Resolution: <br /> Piping Run# 1 Piping Run# 2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 311 3" <br /> Length of Piping Run: 40 ' 40 ' <br /> Product Stored: Rect Su <br /> Method and location of -from pipe sump to <br /> piping-run isolation: under disp, an SAME <br /> Wait time between applying <br /> pressure/vacuum/water and z hr. hr. <br /> starting test: <br /> Test Stan Time: 8:20 8: 2 0 <br /> Initial Reading(R,): 4 . 5 PSI 4 <br /> . 5 PSI <br /> Test End Time: 9:20 9: 20 <br /> Final Reading(Rt): 1 .5 PSI 4. 5 PSI <br /> Test Duration: 1 hr. 1 hr. <br /> Change in Reading(RAR,): 3 PSI 0 <br /> Pass/Fail Threshold or <br /> Criteria: 3 PSI per hr. 0 Loss <br /> Test Result: U Pass XJ Fail XJ Pass U Fail U Pass U Fall U Pass U Fan <br /> CommetltS- (include information on repairs made priors testing, and recommended follow-up forfailed tests) <br /> Probable leak rubber flex connectors under Bravo Boxes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.