Laserfiche WebLink
r— *I.. .00, / <br /> 4WRCi3,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: $Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: i+Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) q <br /> Test Equipment Used: - n 'ter Equipment Resolution: <br /> Piping Run# ' fPiping Runp# Z 9 1 Piping Run# 7 Piping Run# <br /> Piping Material: /LP / r �I <br /> Piping Manufacturer: v Y� QYavl <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Ue <br /> Product Stored: So h2 'n� <br /> Method and location of !P5 f leo.f wry nt 7-St 4-o-1 tc,"O,tle ),15+ 400' <br /> piping-run isolation: 1 <br /> Wait time between applying <br /> pressure/vacuum/water and 15t ,11"1 <br /> starting test: y <br /> Test Start Time: <br /> Initial Reading(Ri): S 7, s: 3 O <br /> Test End Time: j 2 <br /> Final Reading(RF): <br /> Test Duration: ✓ <br /> i <br /> Change in Reading(RF-RJ: <br /> Pass Fail Threshold or -;)- <br /> Criteria: <br /> Test Result: ❑ Pass Fail Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(inclu I information on re airs mode pri r tot tin , and recommended follow uv for failed tests) <br /> u s P Ca <br />