My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO 1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:50:15 PM
Creation date
11/8/2018 9:58:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\V\VICTOR\930\PR0502817\COMPLIANCE INFO\COMPLIANCE INFO 1985-2006.PDF
QuestysFileName
COMPLIANCE INFO 1985-2006
QuestysRecordDate
5/19/2016 8:14:18 PM
QuestysRecordID
3086574
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r— *I.. .00, / <br /> 4WRCi3,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: $Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: i+Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) q <br /> Test Equipment Used: - n 'ter Equipment Resolution: <br /> Piping Run# ' fPiping Runp# Z 9 1 Piping Run# 7 Piping Run# <br /> Piping Material: /LP / r �I <br /> Piping Manufacturer: v Y� QYavl <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Ue <br /> Product Stored: So h2 'n� <br /> Method and location of !P5 f leo.f wry nt 7-St 4-o-1 tc,"O,tle ),15+ 400' <br /> piping-run isolation: 1 <br /> Wait time between applying <br /> pressure/vacuum/water and 15t ,11"1 <br /> starting test: y <br /> Test Start Time: <br /> Initial Reading(Ri): S 7, s: 3 O <br /> Test End Time: j 2 <br /> Final Reading(RF): <br /> Test Duration: ✓ <br /> i <br /> Change in Reading(RF-RJ: <br /> Pass Fail Threshold or -;)- <br /> Criteria: <br /> Test Result: ❑ Pass Fail Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(inclu I information on re airs mode pri r tot tin , and recommended follow uv for failed tests) <br /> u s P Ca <br />
The URL can be used to link to this page
Your browser does not support the video tag.