Laserfiche WebLink
:002 <br /> Page g of y <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> ,ot Equipped With S ill/Overfill Containment Boxes ❑ <br /> X11 Containment Boxes are Present,but were Not Tested ❑ <br /> Jethod Developed By: EI-Spill Bucket Manufacturer <br /> >9[ndus[ry Standard C1 Professional Engineer <br /> ❑Other(Specify) <br /> fest Method Used: ❑Pressure <br /> ❑Vacuum <br /> iydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: 'I_vt( un <br /> Equipment Resolution: oma/ � <br /> Spill Box# y? Spill Box#Z A/ Spill Box# Sill Box# <br /> Bucket Diameter: 2 c, P <br /> (2 " <br /> Bucket Depth: it 4 U <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startin test: <br /> Test Start Time: <br /> Initial Reading(RI), l <br /> ( J G/ Do aey 2 237 <br /> Test End Time: VI Z /�/G <br /> Final Reading / ' Z <br /> (R r)' 00 00 3. 231- 3, 23t <br /> Test Duration: / _ ^ <br /> Change in Reading(Rr-R,): S ;^ (S I rn;^ <br /> $ $ <br /> Pass/Fail Threshold or <br /> Criteria: -.601- -•002 daz �,00 <br /> Test Result: Pass ❑Fail AT <br /> Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on re airs made rior to testing, and recommended follow-u for ailed tests) <br />